News Focus
News Focus
icon url

uksausage

06/25/13 2:55 PM

#231657 RE: loanranger #231656

I cannot think of any reason why #4 would be installed in Niagara Falls and not in Jacksonville.

That doesn't mean components aren't put together and tested before shipping but thee is no reason to have another processor running in a site where they cannot get enough plastic anyway.

Jacksonville has unlimited plastic (raggertail) and is where they need to focus once 33 is up running fully permitted and profitable.

I agree from the photo the only place you might have room is behind the photographer. It supports the plan to not use the room for production but test and ship.

icon url

ohiotom

06/25/13 3:16 PM

#231659 RE: loanranger #231656

Fear not..the JBI 'think tank'...aka 'I think, tank' under the direction of their Master Chemist, has it all frigured out.


imo


tom
icon url

capra1

06/26/13 12:58 AM

#231711 RE: loanranger #231656

Includes Post #231657. You missed an important detail when you looked at the pictures of #3. Note that #2 had 4 condensation towers that were ceramic bat wrapped to prevent employee burns. The new photos of #3 have 8 towers ,4 of which are wrapped. This would suggest that other 4 are not being used at this time. There is enough room for #4 when only the main processors is installed down the second half of the building with no room required for additional towers. All fluids would be discharged from the same side of the building.This is why I thought #4 was planned for that building Also note.(The door at the back of the building was not part of the original structure)
(only allowed one message/day)