News Focus
News Focus
Followers 210
Posts 32730
Boards Moderated 1
Alias Born 06/30/2009

Re: capra1 post# 231653

Tuesday, 06/25/2013 2:31:22 PM

Tuesday, June 25, 2013 2:31:22 PM

Post# of 312101
"There's still enough room on the other side of the door to fit #4."

Thanks, but this photo appears to show the kilns for #3 on the center line of the building (based on the roofline and the door opening), which led me to believe that the area to the left of the kilns was occupied by additional P#3 components. If that's the case, the footprint width of P#3 takes up more than half of the building. The only way #4 could fit, assuming an identical footprint, would be if I'm mistaken about what the photo appears to show. Am I?
Is there not also an office of sorts on the right at the far end of the photo that would impinge on the length of the footprint of a second processor?
http://investorshub.advfn.com/uimage/uploads/2013/6/13/nphl%5B02.jpg

Thanks again.

Now you've gone and done it!

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y