Is doesn't matter when the conversion of the Dumping Dilution into long term preferred gets done when ever that is TWO WEEK in the Month of January 2026 the R/S will be completed.
Dilution to long term preferred the first TWO WEEKS in the Month of January the R/S should be completed.