Capacity of Coos Loop = 100 MW. Laidlaw = 65 MW. Clean Power = 27 MW. Granite Reliable Power (Noble) = 99 MW (Variable). No 1 on line GRP = 99 MW (variable source) No 2 on line CPD = 27 MW (variable output balanced with Noble) Total = 126 MW Only room for one new generator in Berlin. It will be either LLEG or CPD until lines are upgraded (earliest 2014)