Thursday, August 28, 2025 7:39:21 AM
Great drill holes, no question. But these are only 6 of the 616 holes drilled into the Colosseum deposits.
Even with these holes incorporated into Dateline's most recent resource estimate (June6/24) the average grade of the whole shebang is still only 1.26 g/t Au. Lowish grade. Have a look at the 3D block model on p.7 of their resource update report (link below). See the small red dot? That's their high-grade. The vast majority of the block model is blue & green - low grade.
And these widths (thicknesses) in the drill intercepts you're quoting are drill lengths, not 'thicknesses' of the mineralization. Depends on the angle of your drill holes relative to the plane of the mineralization, no? Basic trigonometry Chen...
Now grade is relative of course. A huge deposit like Agnico's Detour Lake has an average total resource grade of only ~ 0.74 g/t. But their total resource is 22 Moz, and they're producing ~ 700 Koz/yr at a cheap AISC of ~ $800/oz. Economies of scale, Chen!
What was Dateline projecting in their latest PEA? 71 Koz per year for ~ 8 years for a total production of 635 Koz. That's it that's all. Lowish grade, AND small. And the BFS is unlikely to make it any larger/better, just provide a more accurate economic assessment of the project.
June 06 2024 Resource for Colosseum
May 26 2025 Updated Scoping Study
Even with these holes incorporated into Dateline's most recent resource estimate (June6/24) the average grade of the whole shebang is still only 1.26 g/t Au. Lowish grade. Have a look at the 3D block model on p.7 of their resource update report (link below). See the small red dot? That's their high-grade. The vast majority of the block model is blue & green - low grade.
And these widths (thicknesses) in the drill intercepts you're quoting are drill lengths, not 'thicknesses' of the mineralization. Depends on the angle of your drill holes relative to the plane of the mineralization, no? Basic trigonometry Chen...
Now grade is relative of course. A huge deposit like Agnico's Detour Lake has an average total resource grade of only ~ 0.74 g/t. But their total resource is 22 Moz, and they're producing ~ 700 Koz/yr at a cheap AISC of ~ $800/oz. Economies of scale, Chen!
What was Dateline projecting in their latest PEA? 71 Koz per year for ~ 8 years for a total production of 635 Koz. That's it that's all. Lowish grade, AND small. And the BFS is unlikely to make it any larger/better, just provide a more accurate economic assessment of the project.
June 06 2024 Resource for Colosseum
May 26 2025 Updated Scoping Study
Recent DTREF News
- Colosseum Bankable Feasibility Study Confirms High Margin Gold Project • ACCESS Newswire • 05/11/2026 12:00:00 PM
- Dateline Comments on Media Coverage Regarding Colosseum Mine • ACCESS Newswire • 04/16/2026 12:00:00 PM
- Dateline Completes A$50M Institutional Placement to Advance Colosseum • ACCESS Newswire • 04/01/2026 12:00:00 PM
- Dateline Secures Second Rig to Fast-Track Colosseum REE Program • ACCESS Newswire • 03/19/2026 12:00:00 PM
- High-Resolution Airborne Survey Completed at Music Valley HREE Project • ACCESS Newswire • 03/17/2026 12:00:00 PM
- Dateline Commences Music Valley Exploration Program • ACCESS Newswire • 03/03/2026 01:00:00 PM
- Dateline Acquires U.S. High-Grade heavy Rare Earths Project • ACCESS Newswire • 02/27/2026 01:00:00 PM
- Colosseum Geophysics Points to Large Intact Carbonatite Targets • ACCESS Newswire • 02/25/2026 01:00:00 PM
- Diamond Drilling Confirms Wide Gold Intercept in Northeast Extension of North Pipe at Colosseum • ACCESS Newswire • 02/12/2026 01:00:00 PM
- Geophysics Converge Ahead of Colosseum Deeper Drill Program • ACCESS Newswire • 02/09/2026 01:00:00 PM
- Rare Earth Targets Refined as IP, MT, Radiometric and Geological Data Converge at Colosseum Project • ACCESS Newswire • 01/26/2026 01:00:00 PM
- Dateline Resources Completes $35M Institutional Placement to Expand Drilling and Advance Colosseum Towards Production • ACCESS Newswire • 01/23/2026 01:00:00 PM
- Colosseum Bankable Feasibility Study Advances to Final Stages • ACCESS Newswire • 01/20/2026 01:00:00 PM
- Wide Gold Intercepts Extend Colosseum Resource Zones • ACCESS Newswire • 01/12/2026 01:00:00 PM
- Dateline Strengthens Board with Appointments of George Brack and Phillips Baker Jr • ACCESS Newswire • 01/05/2026 01:00:00 PM
- Dateline Delivers Further High-Grade Intercepts from North Pipe at Colosseum • ACCESS Newswire • 12/15/2025 01:00:00 PM
- Colosseum BFS Drilling Returns Wide Intercepts in North Pipe • ACCESS Newswire • 12/03/2025 01:00:00 PM
- Australian Rare Earths & Critical Minerals Virtual Investor Conference: Presentations Now Available for Online Viewing • GlobeNewswire Inc. • 11/20/2025 01:35:00 PM
- Dateline Resources to Present at the Australian Rare Earths & Critical Minerals Virtual Investor Conference November 19th • GlobeNewswire Inc. • 11/18/2025 04:29:12 PM
- Australian Rare Earths & Critical Minerals Virtual Investor Conference Agenda Announced for November 19th • GlobeNewswire Inc. • 11/18/2025 01:35:00 PM
- Dateline Returns Wide Gold Intercepts at Colosseum • ACCESS Newswire • 11/18/2025 01:00:00 PM
- Dateline Advances BFS, Prepares to Test Gold & REE Targets • ACCESS Newswire • 10/27/2025 01:25:00 PM
- Dateline Advances BFS, Prepares to Test Gold & REE Targets • ACCESS Newswire • 10/27/2025 12:00:00 PM
- Junior Miner Secures America’s Largest Strontium Deposit, Shares Hit 52-Week Highs • AllPennyStocks.com • 09/15/2025 05:34:00 PM
- Shares of This Junior Miner Surge as New Gold Targets Spark Investor Excitement • AllPennyStocks.com • 08/19/2025 04:17:00 PM
