News Focus
News Focus
Followers 107
Posts 4359
Boards Moderated 0
Alias Born 03/16/2017

Re: Jack_Herer post# 7631

Thursday, 08/28/2025 3:00:44 AM

Thursday, August 28, 2025 3:00:44 AM

Post# of 12799
Hole CM23-14: 70.1 m @ 6.53 g/t Au, including 25.9 m @ 15.31 g/t Au
Hole CM23-08: 76.2 m @ 8.62 g/t Au, with 23.5 m @ 21.8 g/t Au
Hole CM22-04: 10.67 m @ 13.71 g/t Au
Hole CM22-05: 19.81 m @ 5.19 g/t Au
Hole CM23-08: 63.2 m @ 10.28 g/t Au, including 23.5 m @ 21.8 g/t
Hole CM24-16: 104.7 m @ 3.65 g/t Au, including 12.2 m @ 8.40 g/t Au
RC24-008: 74.7 m @ 4.27 g/t Au, including 27.4 m @ 7.82 g/t Au

Grades above 5 g/t are often considered high-grade in open-pit gold operations.
Grades above 10 g/t are exceptional, especially when accompanied by substantial widths.

Many of the gold grades reported by Dateline Resources at the Colosseum project are high, with drill holes consistently delivering both high-grade and thick mineralized zones
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent DTREF News