I bet the delay was due to the fact that word is out that Treaty does not pay their bills and the contractor's are requiring cash on the barrel head...
Treaty always has excuses...
The weekly news letter should be called the "Excuses letter".
That rig is there to run a bail or a sand pump to remove sand from the perfs. Bull reported 30 000 thousand pounds with acid flush injected to refract an older production zone. Perfs sanding up is a common occurrence, and should have been removed in less than two days after acid expansion is depleted. Sounds like more mgmt problems. Probably enuff bottom hole pressure to float a hot air balloon