That rig is there to run a bail or a sand pump to remove sand from the perfs. Bull reported 30 000 thousand pounds with acid flush injected to refract an older production zone. Perfs sanding up is a common occurrence, and should have been removed in less than two days after acid expansion is depleted. Sounds like more mgmt problems. Probably enuff bottom hole pressure to float a hot air balloon