JBII's 4 and 5 processors are going to be at the RockTenn(NYSE:RKT) site in Florida........that makes the most sense since there are literally MILLIONS of tons of waste plastic in RockTenn's monofills of waste plastic.........and JBII has a 10 Year contract to convert that FREE plastic into ASTM END USER Fuels............z
i have no doubts that is the presumption .. but i'm not so sure i agree since imo FLA site won't be *ready* for how many more months/Qs?
i have my own thoughts on where 4 and 5 are headed .. but clearly my thoughts are pure spec
that said i have few doubts that Rock Tenn (FLA site) gets X no. of prox b4 the eo 2014
here's to those specific 8ks' filed (for 4 and 5) and P2O/P2F success and the global attn generated .. :)
My speculation is #4 and #5 will not be at RockTenn. A guess might be one will be located in the NYC area to process municipal waste.
I am guessing the master plan for RockTenn has been on hold until the operating metrics for the processors was determined.
Will the processors do 4000#/hr or 8000#/hr?
Will the up-time be 50%, 75% or 99%?
That information factors into logistical considerations.
The performance of the new processor likely needs to be taken into consideration for RockTenn facility designs. I expect the plan to emerge soon and for rapid installations at multiple RockTenn sites, Jacksonville first.