Ok I agree on that. Now brainstorming a bit the magnetron supplier maybe willing to skip the middleman if a large p.o. is given,,who knows maybe just maybe the dam machine will eventually see production..also I am glad the were able to upgrade the magnetrons,,the original ones had the water input on the east side and the outlet on the north side very difficult to pipe when you have the magnetrons installed only 4 inches from each other in a number 4 dice configuration... in order to pipe the magnetrons in series an S pipe configuration would have to be used between each magnetron. The proper way should have the water inlet on the east side and the outlet on the west that way you don't have to use so many elbows..