The revenue will be delayed to the company at least 30 days after the first load of oil leaves the field. Most companies pay on 30-45 day payment schedules. The oiland water mixture will come from the well head to a production line that line will run to a oil/water seperator the water will then be pumped back down into a disposal well to maintain the water pressue within the field. The oil in this field is water driven, which is a fantastic setup to have. The oil will be stored on site in a tank battery and will be trucked out when the tanks get close to full. The revenue projection I made yeaterday should be pretty darn close. At least close enough to use for now... Depending on the methods used this field could be operated with 2-3 full time employees. This is not a high overhead or expensive endeavor to operate..