#10151 RE: thehawk72 #10150

WOLV obtained the required permits to start drilling on targets that were identified by the IP survey.

The drilling was going to start, after some additional parts were obtained:

From Doubloon's post:

From what I have heard the core boxes have been made and shipped to Luke, the geologist and Luke have the time slotted in, the only glitch was that some of the backup pieces to the drill rigs did not fit or were of substandard quality so they have been reordered. Makes sense if you are going into the field to have extra peices that could have to be replaced. Looks like a 7 to 14 day delay and not any more than that. On a upbeat note, there is an unconfirmed rumor that the drill may do a couple of extra holes on a 45 degree angle at the edge of Willies duck pond. The IP showed a strong concentration on either side of the pond but, as we know, it was not frozen solid enough to do an IP over the pond.
Although still highly speculative, Willies duck pond could be one of the high value targets.



http://investorshub.advfn.com/boards/read_msg.aspx?message_id=62928094
icon url

coldwater

05/17/11 2:16 PM

#10152 RE: thehawk72 #10150

Drilling generally takes a month to a month and a half, then add another 6 weeks for analysis and results. I'm not sure if they started drilling yet. Like everything, it usually takes longer than expected. People that are saying June are likely wrong. I'm thinking August. Keep in mind these next drill results will likely prompt additional drilling. Assuming they are successful, they will poke many holes into the ground over the next year to fully prove up the grounds. These upcoming results though are the make it or brake it results.