Tuesday, May 17, 2011 2:03:02 PM
The drilling was going to start, after some additional parts were obtained:
From Doubloon's post:
From what I have heard the core boxes have been made and shipped to Luke, the geologist and Luke have the time slotted in, the only glitch was that some of the backup pieces to the drill rigs did not fit or were of substandard quality so they have been reordered. Makes sense if you are going into the field to have extra peices that could have to be replaced. Looks like a 7 to 14 day delay and not any more than that. On a upbeat note, there is an unconfirmed rumor that the drill may do a couple of extra holes on a 45 degree angle at the edge of Willies duck pond. The IP showed a strong concentration on either side of the pond but, as we know, it was not frozen solid enough to do an IP over the pond.
Although still highly speculative, Willies duck pond could be one of the high value targets.
http://investorshub.advfn.com/boards/read_msg.aspx?message_id=62928094
Recent WOLV News
- Wolverine Announces Receipt of Partial Revocation Order and $250,000 Financing • Newsfile • 12/16/2025 02:00:00 PM
- Form 10-Q - Quarterly report [Sections 13 or 15(d)] • Edgar (US Regulatory) • 04/15/2025 09:27:02 PM

