News Focus
News Focus
icon url

74stingray

02/01/11 6:16 PM

#128830 RE: eiddle #128828

They just need to report the results already determined at the lab, they are not compiling a NI report, not with just 2 holes drilled.
they are years away from having enough drilling done at the pace they are going for such a report.
In my opinion they already have the results from hole 2 and are purposely holding them back, they most likely had all the results since late December.
icon url

gump90

02/01/11 6:20 PM

#128831 RE: eiddle #128828

The procedure is as simple as it gets. The company geo gets the assays from the lab .. probably by e-mail. They are all numbered and he enters them in his drill logs of the holes .. clerical work .. fast. Then if he wishes to do some calculations with them to expand the intersections it's simple math. And also fast. He doesn't have to file them anywhere with anyone. He shows them to Ken and they would immediately start to draft up a news release ( if Ken wants to ). It's all fast and there is no work load involved. This is entry level calculation for a property like Rusty with a tiny drill program and relatively few assays. If the geo received all the remaining assays from Rusty it would take him about 5 minutes to ' analyze ' them visually. They are but numbers. He'd either be saying WOW or oh S*** !!