They just need to report the results already determined at the lab, they are not compiling a NI report, not with just 2 holes drilled. they are years away from having enough drilling done at the pace they are going for such a report. In my opinion they already have the results from hole 2 and are purposely holding them back, they most likely had all the results since late December.