Wouldn't that make a lot of sense? Screw the effort required (and the inevitable race to the bottom) to provide a AG across the board while locking in an acceptable margin (and locking out Sandoz - at least for a while). If I was the buyer, though, I'd insist on some sort of mandatory periodic price-review-and-adjustment if the contract was for the longish term.