Joe - That's top notch - Thanks!!! - I've added the description to the pictures in this post: 1. The top photo is the DDI HDU (Horizontal drive Unit) with a Mini carousel. It is retrieving the OilStates/Wellstream 180 foot long Flexible flow line jumper that was on Lost Ark 1 and will be reconfigured to become a part of the Lost Ark 2 hybrid jumper. – DDI Picture 2. #2 is the Oil States gooseneck and flow line connector at the original SIT several years ago – Oil State Picture
3. This is a close up of the Oil states flow line connector and the strong back Global Industries added for the original installation a few years ago. – Oil states photo.
4. Bottom picture is DDI rigging attached sub sea by the Saipem ROV to pull the gooseneck and connector off the Lost Ark 1 flow line hub to bring it to the surface to use it for Lost Ark 2 as seen on the mini carousel – DDI picture