News Focus
News Focus
Followers 25
Posts 1795
Boards Moderated 0
Alias Born 12/06/2007

Re: JoeSmith post# 49008

Friday, 02/01/2008 8:29:57 AM

Friday, February 01, 2008 8:29:57 AM

Post# of 107353
Joe - That's top notch - Thanks!!! - I've added the description to the pictures in this post:
1. The top photo is the DDI HDU (Horizontal drive Unit) with a Mini carousel. It is retrieving the OilStates/Wellstream 180 foot long Flexible flow line jumper that was on Lost Ark 1 and will be reconfigured to become a part of the Lost Ark 2 hybrid jumper. – DDI Picture

2. #2 is the Oil States gooseneck and flow line connector at the original SIT several years ago – Oil State Picture


3. This is a close up of the Oil states flow line connector and the strong back Global Industries added for the original installation a few years ago. – Oil states photo.


4. Bottom picture is DDI rigging attached sub sea by the Saipem ROV to pull the gooseneck and connector off the Lost Ark 1 flow line hub to bring it to the surface to use it for Lost Ark 2 as seen on the mini carousel – DDI picture


Sage

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent KLNG News