It’s only a lie if you can’t reconcile the two statements. Contractor is onsite in November and construction actives have begun. That could mean bringing in equipment and doing prep work. I would imagine since they are doing construction inside an operational facility, the amount of prep work before physical construction would be much more involved than you would do in an unoccupied industrial space. After the preparations, the actual physical construction (drywall, plumbing, electrical, etc.) would begin at the end of January. These statements are not contradictory.