InvestorsHub Logo

Red_Right_Hand

05/13/24 6:39 PM

#691247 RE: flipper44 #691239

So taking those two answers together, the phase 1 activities sound a lot like the kind of activities that could conclude with an RFI or with a confirmation of validation/acceptance (no RFI at the end of phase 1; such as, perhaps, the Notice that was received on March 7th), and are also consistent with statements indicating that the inspections (which happen during phase 2 and happen only if and to the extent deemed required based on the circumstances of each individual application), had not yet taken place as of March 31st, which could have been a date that was three weeks or so into phase 2.

flipper44

05/13/24 7:09 PM

#691256 RE: flipper44 #691239

I’m guessing 90% here did not know that inspections are not typically conducted in Phase I (80 days) of 150 day accelerated review. When conducted, they are conducted the last 70 days of the total 150 days.