I was originally expecting a pr last week after it having been 2 weeks since the consultant came back. Monday-October 30th through Friday November 3rd. Technically it could extend to November 5 as the end of the week the consultant returned. Then a full two weeks after November 5 is November 19. So I’ll wait but if we don’t get a PR by then I’ll definitely be emailing DI with these concerns and report back. Hopefully something will come out by then. I could see a scenario where they actually make the November submission still if the publisher is able to work ahead on the completed portions and able to integrate the absent section in less then the stated 2-3 week period.