The only reason this to me is different is because they decided to stop with the dowsing rod and 2d shenanigans. Going off of MJ01 well completion tests and 3D coupled with those findings gives me pause in considering this well a failure before it starts. MJ01 had porosity, permeability, and natural fractures. If we had the 3D it would be nice to see the peaks and valleys but they must have seen something compelling. I really hope the testing is going well and there are no hangups with worker competency or equipment failures. So much involved and a such a fragile slow process to complete a well like this one.
It’s been a long wait and we shall find out soon enough. I’ll be selling all and not looking back if this well is dry too. I could care less about Zion Drilling Services Inc.