CALI FOREST FIRES - HOMELESS GUY STORY NO LONGER WORKS IF THEY ARE USING ARSON DRONES TO START THE FIRES - WEAPONS OF MASS DISTRACTION! FROM THE NWO GOF BIO WEAPON ZOMBIE VAXX GENOCIDE GOING ON
Gran Colombia Gold changed its name to GCM Mining. The updated Toroparu PEA confirms the world-class potential of the project. Toroparu should reach an average annual production rate of 225,000 toz gold, at an AISC of $916/toz, over the 24-year mine life.
At a gold price of $1,500/toz, the after-tax NPV(5%) equals $794 million.
GCM Mining remains one of the most undervalued gold miners.
A complete summary of the mineralized intersections from the 2021 drill program can be found on the Company's website at www.arisgold.com.
About the Juby Project
The Juby project is an advanced exploration stage project located 15 km west of the town of Gowganda in Ontario, Canada, 150 km by road south-southeast of Timmins and 115 km by road southwest of Kirkland Lake. Site access and infrastructure is excellent with a major highway, local roads, and logging roads providing easy access to site, a power transmission line passing through the property, and abundant water.
The property is located in the Shining Tree area of the southern Abitibi greenstone belt, within 70 km of IAMGOLD's Côté Gold project and Alamos Gold's Young-Davidson mine. The leases extend for 11 km east-west and 9.5 km north-south, covering an area of 5,288 hectares, following the Tyrrell Shear Zone, which hosts all of the known deposits at the project, including the Juby Main Zone (JMZ), Golden Lake Zone (GLZ), Big Dome Zone (BDZ), and Hydro-Creek LaCarte Zone (HCLZ). The JMZ and GLZ deposits are hosted within moderate to steeply dipping, strongly altered and mineralized Porcupine sedimentary rocks, and the BDZ and HCLZ deposits are hosted in moderate to steeply dipping sheared and folded mafic to ultramafic volcanic rocks, sedimentary rocks, and porphyritic dykes of the Kidd-Munro assemblage.
The project currently has 405 drillholes for a total of 116,570 metres in the drilling database. The mineral resources for the Juby Project, effective July 14, 2020, are given in the table below.