The floor cannot support the live load of the tanks. Good idea, but in 99% of locations will require the tear-up and replacement of the load bearing slab.
We looked into this well before the fire.
…unless SHMP used very shallow tanks and spread the load over a wider area, but that changes the whole density dynamics of their common Chinese imported wastewater system they use.