The good thing, it is a huge lease. I can see where it would take a little time to really pour over closely the 3D.
In that case even better, the 3D of this so called large lease, covered only 17% of the total acreage. Most like the locals insisting the 3D, and any future drilling be limited to the MJ1 area. So yeah, it should take very little time to zero in.