To be honest, this is the business I am in so I'm still wrapping my head around all of this and doing some DD on the engineering companies. I don't listen to the noise so no worries there but so far, it looks on point with how we build our refineries up to a point. I don't believe in the timeline quoted for design drawings though, two weeks is not long enough unless they are just plain conceptual drawings. If this is a cookie cutter then that may be doable in a few weeks, for drawings, still digging. $MMEX