Wednesday, February 21, 2018 11:35:33 AM
To be honest, this is the business I am in so I'm still wrapping my head around all of this and doing some DD on the engineering companies. I don't listen to the noise so no worries there but so far, it looks on point with how we build our refineries up to a point. I don't believe in the timeline quoted for design drawings though, two weeks is not long enough unless they are just plain conceptual drawings. If this is a cookie cutter then that may be doable in a few weeks, for drawings, still digging. $MMEX
Trading 101 - Buy Low - Sell High, Keeps Momma Happy
Recent MMEX News
- Form 8-K - Current report • Edgar (US Regulatory) • 04/21/2026 01:30:34 PM
- Form 10-Q - Quarterly report [Sections 13 or 15(d)] • Edgar (US Regulatory) • 03/10/2026 08:43:18 PM
- Form 10-Q - Quarterly report [Sections 13 or 15(d)] • Edgar (US Regulatory) • 12/11/2025 07:26:23 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 10/23/2025 11:23:42 AM
- Form 10-Q - Quarterly report [Sections 13 or 15(d)] • Edgar (US Regulatory) • 09/15/2025 04:46:45 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 09/02/2025 04:43:29 PM
- Form 10-K - Annual report [Section 13 and 15(d), not S-K Item 405] • Edgar (US Regulatory) • 07/29/2025 06:02:59 PM
