News Focus
News Focus
Followers 182
Posts 16906
Boards Moderated 0
Alias Born 06/09/2010

Re: nagoya1 post# 61197

Tuesday, 01/29/2013 9:16:29 AM

Tuesday, January 29, 2013 9:16:29 AM

Post# of 67010
GM ng, This is their statement of the Mill from the 10Q filed 2 weeks ago.


Operations at the Pride of the West Mill:

During the quarter ended November 30, 2012, we began very specific analysis to satisfy conditions that were imposed on full permit approval by the DRMS. The core of the permit consists of nine Environmental Protection Faculties (“EPFs”), which are: 1) Mill Building, 2) Ore Stockpile Area, 3) Laboratory Facility, 4) Leach Plant Building, 5) Flood Protection Dike, 6) Plant Waste Water Disposal, 7) Groundwater intercept Drain, 8) Upland Stormwater Intercept Ditch, 9) Mill Tailings Repository.

The conditions specified by the DRMS regard the ninth EPF, the Mill Tailings Repository and simply request additional geotechnical substrate stability analysis, structure specific engineering designs for the cover of the repository, the repository’s reserve capacity, and the always on-going recalculation of financial warranty.

Management believes that these conditions will be satisfied by the end of second quarter, 2013. However, operations within the approved areas have been rapidly initiated.


567

GL

BTW 2nd quarter ends February 28th for CGFI


If I got it right; "That's my one for the year!" If this had been an actual trading emergency you would have been instructed "TO NOT LISTEN TO ME!" There is no substitute for your own DD!!!

Discover What Traders Are Watching

Explore small cap ideas before they hit the headlines.

Join Today