The Multi Cavity unit has not been tested at all. Its in its infancy, essentially a concept. Disgraceful, Robert, disgraceful!! jmo
The timeline, barring any tweaking after tests, would look something like this: Unit goes back to Design 1st so they can plumb it out Robert runs his tests (from here he will decide if any changes are needed, hopefully not) If no changes needed, they will show the unit ASAP to the U.S. Manufacturer already lined up