Scientific Ocean Drilling Vessel (SODV) updates

June report

"Design Logging Systems - A shipment consisting of the wireline heave
compensation (WHC) system,
the SLB workshop, and miscellaneous LDEO
equipment departed Houston on June 12th and is expected to arrive in Singapore
on July 30th. A shipment including radioactive sources as well as explosives is
being coordinated for arrival in Singapore around August 21st. The SLB and
LDEO wireline tools will be shipped in early August for arrival in Singapore no
later than September 21st. LDEO and SLB continue to have weekly conference
calls to track the status an planning on all projects."

"• August 2nd to August 9th: Perry Pierre (SLB Mechanical Engineer) will
work on the installation of the WHC system, sheaves, and the SLB
workshop.

August 21st to Sept 8th: Gerardo Iturrino (SODV LDEO Project Manager),
Kerry Swain (SLB Field Engineer), and an SLB Electronic technician will
arrive in Singapore for the installation of the equipment in the logging
office, telemetry lab, and downhole measurements lab; work will also
include running cables from the logging office to the telemetry and
downhole labs, from the telemetry lab to the logging platform, to the SLB
workshop, to the underway geophysics lab, and to the motion reference
unit (MRU) in the mud room; installation of junction boxes and
termination of cables; installation of racks and equipment in the laboratories and offices; testing all systems including preliminary
functional tests of the WHC system.
"

"October 9th: LDEO personnel participating in the SODV sea trials will
arrive in Singapore and begin preparations for the final testing phase of all
logging projects."


http://www.oceanleadership.org/files/sodv/SODV_Monthly_Rpt_June_08.pdf
July report
http://www.oceanleadership.org/files/sodv/SODV_Monthly_Rpt_July_08.pdf


My posts are my opinions. Always dd to your own comfort level.





My posts are my opinions. Always dd to your own comfort level.


Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent KLNG News