Thursday, November 27, 2025 10:43:28 AM
Here is a break-down of what Lightwave Logic is actually planning over the next six months with their new Fortune Global 500 partner and how it maps to their Design Win Cycle.
Here are the relevant sections from the Nov 25 PR about next 6 months of activities:
Throughout the first half of 2026, Lightwave Logic intends to develop a custom variant of its Perkinamine® electro-optic polymer material optimized for the stringent manufacturing conditions of AI scale-up and scale-out where silicon photonics chips are co-packaged with EICs (Electrical Integrated Circuits) and ASICs. In addition, Lightwave Logic intends to co-develop with its partner a technical solution optimized for 400Gb/s CPO applications. This collaboration will extend across multiple technical areas such as high-speed modulator simulation and design, product testing, packaging and assembly processes and the associated Process Design Kit (PDK) for electro-optic polymer integration into standard silicon photonics foundry process.
Note that the entry into Stage 3 of the Design Win Cycle outlined by the Company in prior investor presentations is provisional at this stage, and the formal product launch decision by our partner is contingent upon the successful execution of technical milestones related to Perkinamine® performance as well as achieving various other modulator design and integration results.
Mapping to the Design Win Cycle found in Investor Presentations https://irp.cdn-website.com/a5f8ef96/files/uploaded/Lightwave+Logic+Investor+Presentation+-+September+2025.pdf
Stage 2 – Product Design Activities ✅
✅ Supplying customer with PDK ? “associated Process Design Kit (PDK) for EO polymer integration”
✅ Support modulator design activities ? “high-speed modulator simulation and design”
✅ Interface with foundry to enable material integration ? “develop a custom variant of its Perkinamine®… optimized for co-packaged silicon photonics chips”
✅ Support product reliability program ? “product testing”
Stage 3 – Prototype to Final Product Activities
❌ Support product design iterations (alpha, beta, final) ? Not mentioned; not planned in next 6 months
❌ Support product qualification with end-user (specs, reliability) ? Only early performance demonstration contingent on milestones
⚠️ Improve manufacturing, process yield, and cost metrics ? “demonstrate that electro-optic polymers can deliver high yield products, scale to high volume production while being fully compatible with new processes and packaging tools” – early Stage 3 element, contingent on milestone success
Bottom line:
Over the next six months, Lightwave is mostly doing Stage 2 work ✅: supplying the PDK, supporting modulator design, developing material integration, and performing initial testing. Only tentative Stage 3 elements ⚠️ like early yield/process demonstrations are planned, and these are contingent on achieving technical milestones.
So for the near term, the partner program is clearly in Stage 2, with Stage 3 only starting once milestones are met.
I realize this is in conflict with your own assessment as well as the comment yesterday from Pro that Yves told him they are in Stage 3. It would be helpful for Pro to post both his question to Yves and the full answer provided.
Clearly from both the PR and the update the provisional status of the Nov 25 collaboration is very different than that of the announced formal entry into Stage 3 for the Nov 4 collaboration.
Please note that I'm not trying to twist anything here: I'm relying solely on the company's own words.
Obviously it benefits all of us to have the most clarity possible on what is happening.
..
Recent LWLG News
- Form 144 - Report of proposed sale of securities • Edgar (US Regulatory) • 03/18/2026 08:44:44 PM
- Lightwave Logic High-Speed Modulator Platform Now Available in GDS Factory PDK for GlobalFoundries Silicon Photonics Platform • ACCESS Newswire • 03/16/2026 12:30:00 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 03/13/2026 10:00:07 PM
- Form 144 - Report of proposed sale of securities • Edgar (US Regulatory) • 03/12/2026 07:49:41 PM
- Lightwave Logic stock surges 30% after Tower Semiconductor partnership announcement • IH Market News • 03/12/2026 11:04:40 AM
- Lightwave Logic and Tower Semiconductor Announce Development Agreement to Enable High-Speed, Low-Power Modulators on Tower's PH18 Silicon Photonics Platform • ACCESS Newswire • 03/11/2026 08:30:00 PM
- Lightwave Logic, Inc. Provides Update on Commercial Pipeline and Announces Timing of Fourth Quarter and Full Year 2025 Earnings Call • ACCESS Newswire • 02/24/2026 12:30:00 PM
- Form 144 - Report of proposed sale of securities • Edgar (US Regulatory) • 02/17/2026 10:18:24 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 02/05/2026 11:04:44 AM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 02/05/2026 11:03:11 AM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 02/05/2026 11:02:32 AM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 02/05/2026 11:01:49 AM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 01/29/2026 12:04:50 AM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 01/28/2026 12:44:51 AM
- Form 144 - Report of proposed sale of securities • Edgar (US Regulatory) • 01/27/2026 09:37:39 PM
- Form 10-Q/A - Quarterly report [Sections 13 or 15(d)]: [Amend] • Edgar (US Regulatory) • 01/20/2026 01:35:19 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 01/20/2026 01:30:24 PM
- Lightwave Logic, Inc. and QPICs Announce Partnership to Advance the Use of Electro-Optic Polymers in Quantum Processors • ACCESS Newswire • 01/15/2026 09:30:00 PM
- Form 3 - Initial statement of beneficial ownership of securities • Edgar (US Regulatory) • 01/15/2026 09:25:42 PM
- Lightwave Logic, Inc. Announces Appointment of Dr. Aref Chowdhury as Chief Technology Officer & Head of Strategy • ACCESS Newswire • 01/12/2026 12:30:00 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 01/08/2026 01:00:22 PM
- Lightwave Logic, Inc. to Attend 28th Annual Needham Growth Conference • ACCESS Newswire • 01/08/2026 12:30:00 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 01/06/2026 02:25:43 AM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 01/06/2026 02:24:27 AM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 01/06/2026 02:23:03 AM
FEATURED Cannabix Technologies Announces First Delivery of Marijuana Breath Test (MBT) to a Major Construction Client • Mar 19, 2026 12:45 PM
ECGI Building in Crypto's Top-Performing Sector as Tokenized Real-World Assets Surge Past $26 Billion • ECGI • Mar 19, 2026 8:30 AM
Advances in Domestic Heavy Rare Earth Minerals Production Essential for North American Defense Stockpiles • ALOY • Mar 18, 2026 9:00 AM
ECGI Advances $10M Mortgage Tokenization Pilot as SEC Interpretation Adds Clarity • ECGI • Mar 18, 2026 8:45 AM
ECGI Advances Mortgage Tokenization Pilot as Institutional Market Rails Continue to Develop • ECGI • Mar 17, 2026 8:30 AM
Record Gold Prices Reshape Economics of New Mine Development • SNWGF • Mar 16, 2026 10:46 AM
