News Focus
News Focus
Followers 43
Posts 5340
Boards Moderated 0
Alias Born 12/05/2021

Re: flipper44 post# 799046

Friday, 11/21/2025 6:25:27 AM

Friday, November 21, 2025 6:25:27 AM

Post# of 819929
Your capacity numbers are mostly fantasy.

* NWBO has never disclosed throughput for the two Grade B suites.
* “600 per year per suite” has no basis in any filing, inspection report or MHRA document; you made that up
* A “C suite for Eden” is not confirmed as operational the 10-Q only says design/engineering is being refined, not that a functioning suite exists.
* Flaskworks capacity depends on number of machines, not square footage, and NWBO has never published a per-machine throughput.
* Your “1500 patients per year” is just B-suite guesswork + C-suite guesswork = bigger guess.
* Calling future C-suites “cookie-cutter expansion” ignores the reality that every new cleanroom requires separate HVAC qualification, environmental monitoring baselines, IQ/OQ/PQ, and MHRA inspection. None of that is copy-paste.

The only facts we actually have are:
* Two Grade B suites exist and are licensed.
* A C-lab expansion is in progress, but no capacity numbers are public.
* Flaskworks/Eden is the intended scale-up pathway, not manual. I suggest keeping up with the last PR
* Everything beyond that is speculation dressed up as capacity math.
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent NWBO News