You're looking at the process sequentially. But if XERI can get a major financing commitment on that (non-dilutive) tax-free green bond fund, I wouldn't be surprised to see the timeline compressed significantly -- beginning with commercial production of boards via a contract manufacturer before the end of the year and then ramping up of production in the first of their dedicated factories (in an existing structure) by mid-2025. (That's just a semi-educated guess.) After that, assuming sales justify faster expansion, they could probably go into overdrive and have multiple factories in strategic locations (also in existing structures) across the US in full-scale operation by the end of 2025. Save this post and let's come back to it in 6 months, 12 months, and at the end of 2025 and see if I'm right.
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent XERI News