I believe the SGS report (if it is accurate as posted) to be in error or changes were made in excess of the changes made in the report, in my opinion.

Look at the pictures and see what’s missing ? This is a test to make one think, giving the answer will not help anyone with their thoughts

Is the system still up and running in Tennessee or Kentucky at the Ford dealership or do I have the wrong state ?

I see Holcomb is 80. I wanna meet that guy, just because some don’t understand fully his system, doesn’t make him wrong. He’s going somewhere with his thoughts and those should be shared for other’s views and opinions. Like, why does HES purposely flip the wild leg stinger from B phase to C phase, unlike the NEC code. Is this wrong ? Maybe to the letter of NEC, but there are many buildings wired incorrectly like this and it only matters that the electrical contractor know which is which and wire appropriately. What does Robert Holcomb see in the relationship between the A phase and the C phase that necessitates moving the wild leg stinger to the 3rd position ? I wanna know what he knows before he dies. I am obsessed with how the HES is supposed to work and why.

I don’t give a shit about the stock or share prices


1.6.
The field evaluation process was applied to this particular system since it was not a “listed” product.

1.7.
This field evaluation process for this product listed in this report was for a one-of–a-kind, limited production, used, or modified products that were not listed or labeled under a full listing & certification program.


1.8.
This process could have been completed @ the point of manufacturing, interim points of distribution, in the company’s facilities or at the final installation site or a combination of the above. In the report, the labeling location was identified.

2.0 Summary

2.1.

The equipment was labeled as indicated in the table below & modifications outlined in the field evaluation checklist were completed prior to the equipment being labeled.

Manufacturer Model No. Serial No. SGS Label No
Holcomb Inline Power Generator ILPG 100 001 Q32997
Holcomb Inline Power Generator ILPG 40 001 Q32998
Holcomb Power Converter Inline Power
Generator PC ILPG 40 001 Q3299

2.2.
The equipment listed in this field evaluation report complies with the requirements as outlined in the report & the field evaluation shall not be considered the equivalent of a listing & it is suitable for the installation location as identified in the report.