Tony you were onto a big one but left early . ceo.ca/high
By the looks of it high grade and very big . About 7 lbs of Au and 18 lbs of silver/ ton over 1 1/2 m. Other places long intercepts and high grade .
It takes a long lived and many reactions for that much mineral to be laid down . That also implies a halo around that engine will be big and of high value as well .