Friday, August 28, 2015 9:07:53 AM
If overpricing was the reason for things falling through....and I'm not saying it wasn't. Steipp is a greedy slob. But we have ENGEL now, and I have a feeling....ENGEL is going to have a lot more to say about things than before. They know about Steipps pay request. They know a lot now about Steipp
and LQMT. They are not going to let a greedy little Napoleon screw up the works...That's why I'm pretty sure, and hope...that ENGEL has the reins on the EUROPEAN Prototype contract and they are
going to be looking closely at Steipps behavior. This may be one reason someone in top management is leaving. I don't think that was an inside decision. I have a feeling either APPLE or ENGEL or BOTH
have started kicking some butt.
and LQMT. They are not going to let a greedy little Napoleon screw up the works...That's why I'm pretty sure, and hope...that ENGEL has the reins on the EUROPEAN Prototype contract and they are
going to be looking closely at Steipps behavior. This may be one reason someone in top management is leaving. I don't think that was an inside decision. I have a feeling either APPLE or ENGEL or BOTH
have started kicking some butt.
Recent LQMT News
- Form 10-Q - Quarterly report [Sections 13 or 15(d)] • Edgar (US Regulatory) • 05/08/2026 08:37:19 PM
- Liquidmetal Technologies Inc. to Present at the LD Micro Main Event XIX • Newsfile • 10/06/2025 11:30:00 AM
- Form 10-Q - Quarterly report [Sections 13 or 15(d)] • Edgar (US Regulatory) • 08/13/2025 08:00:57 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 07/10/2025 08:02:21 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 05/29/2025 08:02:37 PM
