News Focus
News Focus
Followers 113
Posts 16674
Boards Moderated 0
Alias Born 05/22/2011

Re: jpaige17 post# 17720

Monday, 06/30/2014 8:58:06 PM

Monday, June 30, 2014 8:58:06 PM

Post# of 239554
In August 2013, the army revealed that the XM25 may move to low-rate initial production (LRIP) by August 2014. The weapon is currently in the engineering and manufacturing development (EMD) phase and not yet ready for fielding. By August 2014, it is expected to reach Milestone C, starting LRIP for 1,100 weapons and needed ammunition. Low-rate production would lead to type-classification, resulting in removing the "X" from its designation. Improvements are being made concerning the fire control system, battery life, weight, and magazine size. Following Milestone C in 2014, the system will go through initial operational tests and live-fire tests in 2015. The XM25 is expected to be combat-ready by the end of 2015, and be fielded with all brigade combat teams, as well as the Army Special Operations Command, special forces detachments, and ranger regiments. Automated production will reduce the price of the system to $35,000 for the weapon and fire control system, and $55 per round
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent LQMT News