Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
The state registration of companies is finished, isolated from the composition JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of Power System Management"
04.04.2005
Moscow
1 April in the inter-district inspection of the federal tax service of
Russia on g. To Moscow are registered 13 new companies, isolated from the composition JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of Power System Management".
They were created on the base JOINT STOCK COMPANY of "Mosenergo -
Moscow Regional Administration of Power System Management": JOINT STOCK COMPANY "controlling energy company", JOINT STOCK COMPANY "main net company", JOINT STOCK COMPANY "Moscow urban electric-net company", JOINT STOCK COMPANY "Moscow heat-net company", JOINT STOCK COMPANY "Moscow provincial electric-net company", JOINT STOCK COMPANY Of Mosenergosbyt, JOINT STOCK COMPANY "specialized drawing and designing bureau for
repair and reconstruction", JOINT STOCK COMPANY Of Mosteploset Energoremont, JOINT STOCK COMPANY Of Mosenergoset'stroy, JOINT STOCK COMPANY Gray (Kashira), JOINT STOCK COMPANY "of GRES - State Regional Electric Power Plant -5" (Shatura), JOINT STOCK COMPANY "of GRES - State Regional Electric Power Plant -24" (Ryazansk) and JOINT STOCK COMPANY "Zagorskiy GAES".
The brand of "Mosenergo - Moscow Regional Administration of Power
System Management" was preserved for the generating company, which consists of 17 power stations by total power about 10 thousand. mW. Company will preserve for itself 47% of active memberships. Kashira, Shatura and Ryazansk GRES - STATE REGIONAL ELECTRIC POWER PLANT they
will be included in OGK No1, OGK No4 and OGK No6 respectively. Zagorskiy GAES will become part JOINT STOCK COMPANY "hydro-HaugK".
From the moment of the state registration of new joint-stock companies
their actions are considered those placed among the shareholders OF
JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of
Power System Management", the registered in the list shareholders OF JOINT STOCK COMPANY of
"Mosenergo - Moscow Regional Administration of Power System
Management" as of this day.
The registered joint-stock companies during April must approve on
their councils of the directors of the solution about the release and
reports about the sums of the release of actions, and also tax the indicated documents into the Federal Service for the
financial markets (FSFR) for their state registration. It is planned, that the registration of reports in FSFR will be realized to June
2005. To the moment of registering the report about the sums of the release
of actions the rotation of securities is forbidden by the legislation
of the Russian Federation.
"We strive for the creation of the competitory market for the
producers of electric power, - stated the first deputy of the general director OF JOINT STOCK
COMPANY "Mosenergo - Moscow Regional Administration of Power System
Management" on corporate policy and control of property Dmitriy
Vasil'yev. - this will make it possible to differently construct the system of
the production of electric power, and its sale, and the system of tarifoobrazovaniya. Each producer will fight for the user and attempt to propose to it how
interesting as possible and advantageous conditions ".
JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of
Power System Management" approached the thermal-vision inspection of
thermal networks in g. To Moscow
25.11.2004 g.
g. Moscow
The service of technical diagnostics JOINT STOCK COMPANY of "Mosenergo
- Moscow Regional Administration of Power System Management"
approached the thermal-vision inspection of the thermal networks of
the capital. The application of this method will allow JOINT STOCK COMPANY of
"Mosenergo - Moscow Regional Administration of Power System
Management" to save means for conducting of repair campaign.
Heat viewing is conducted, as a rule, two times per year - by early spring and by late autumn, when it is sufficiently cold and heat conductors work in the heating
regime. At its basis the possibility of obtaining the visible image of objects
with their thermal (infrared) radiation lies. With the aid of the special camera is fixed "anomalous" thermal
field, i.e., the leakage of hot water, not yet appeared on the earth's surface. Inspection is conducted with the aid of the special equipment, which if necessary is established on the helicopter. Into the composition of thermal-vision system also enters personal
computer and software, intended for treating the obtained by camera photographs and
conducting statistics according to the results of inspections. This technology was developed by the specialists GNPP Of
"aerogeofizika". Method gives the possibility to operationally reveal not only
sections, on which already occurred the emergency, but also to determine the places of the disturbance of the
heat-moisture-proof layer of conduit.
The key advantage of thermal-vision inspection consists of that, that in conjunction with the complex of other diagnostic works, it is possible to reveal defects on the underground thermal networks, without producing the dissection of soil. Because of this technology of power engineering they can in proper
time prevent the appearance of interference, ensuring the reliable and uninterrupted heat supply of users in the
winter period. Planning the repair of heat conductors is not less important task of
heat viewing. After comparison with the map of Moscow streets thermal photographs
are transferred to the operational regions of the thermal networks OF
JOINT STOCK COMPANY "Mosenergo - Moscow Regional Administration of
Power System Management". Thus, specialists obtain additional information about the state of
conduits, which is used for determining the necessary volumes of repair work.
At present JOINT STOCK COMPANY of "Mosenergo - Moscow Regional
Administration of Power System Management" attends about 2,5 thousand. km of thermal networks, more than third which already manufactured its period of operation. In 2004 the energy company produced the transfer of more than 85,5 km
of the worn thermal mains. Now the thermal networks OF JOINT STOCK COMPANY "Mosenergo - Moscow
Regional Administration of Power System Management" approached the
creation of special information base, in which will be contained the data about the state of capital
heat-net equipment. Use by complete, the reliable and operationally obtained information with planning of
the repair of heat conductors it will allow approximately to 30% to
increase the effectiveness of expenditures due to the transfer of the
actually being needed the replacement of sections conduits.
Are fulfilled 40 years from the day of the base of the center of
training personnel OF JOINT STOCK COMPANY of "Mosenergo - Moscow
Regional Administration of Power System Management"
25.11.2004 g.
g. Moscow
On 25 November, 2004, the center of training personnel OF JOINT STOCK
COMPANY of "Mosenergo - Moscow Regional Administration of Power System
Management" notes its 40- summer anniversary.
The creation of center in 1964 was caused by the rapid introduction of
new energy power, for operating which were required the qualified operational and repair
personnel. More than 400 thousand were prepared in 40 years. the highly skilled workers and specialists.
The cadre policy OF JOINT STOCK COMPANY "Mosenergo - Moscow Regional
Administration of Power System Management" in many respects today
determines the contemporary technologies of the production of electric
power and heat. The specific character of branch requires the presence in energy
company of exceptionally professional colleagues. Therefore the corporate educational establishments OF JOINT STOCK
COMPANY "Mosenergo - Moscow Regional Administration of Power System
Management" are attempted to use in their work the most effective
procedures of professional instruction. "the world experience of training personnel shows, that the prosperity of company is accessible only with the condition
of development and professional growth of personnel ", - noted the director of the center of training personnel Vyacheslav
Voronkov.
Today center organizes instruction more than on 50 professions and 250
specializations of basic directions of heat- and electro-energetics. It is yearly more than 6,5 thousand. workers and specialists obtain an increase in the qualification
without the detachment from the production. In this case the specialists are prepared for the work not only in the
enterprises OF JOINT STOCK COMPANY "Mosenergo - Moscow Regional
Administration of Power System Management", but also for other companies.
The center of training personnel is the member of the association of
the non-governmental educational establishments of electro-energetics
and the member of the international association of poslevuzovskogo
formation, actively he collaborates with guiding centers and VUZ - Institute of
Higher Education in the region of additional formation.
Open Society " Mosenergo " has increased rates of modernization of cable networks
translated - edited (Cyrillic text not supported so it was removed from machine translation)
09.09.2004.
Moscow
Within the framework of preparation of a power supply system for a forthcoming winter maximum of loadings of Open Society " Mosenergo " carries out repair and reconstruction of cable lines and the electric equipment. In 2004 volumes of reconstruction and repair of the equipment on some parameters in have some times exceeded planned targets.
In particular, for today the branch of Open Society " Mosenergo " - Moscow cable network executes major overhaul more than 6 thousand cable lines by a pressure(voltage) 0,4-10 sq. In total 110 km of cable networks are replaced almost. Besides preparation for winter of high-voltage cable lines 110-500 sq is practically completed.
Reconstruction of cable lines is carried out(spent) with use of the advanced equipment and technologies of firms " ; " and "Nexans". Instead of out-of-date lines, Open Society " Mosenergo " lays with isolation from tailored polythene which are more durable in operation and correspond(meet) to all modern ecological standards. Besides during reconstruction throughput of cable lines that allows to raise(increase) reliability of power supply of consumers considerably increases.
Repair of 646 transformer substations is lead(carried out) also, on 22 substations the equipment has been completely replaced. Amounts of works on repair ;, executed in the current year, exceeds planned targets almost in 3,5 times. A principal cause of replacement of transformers are significant rates of growth in Moscow - about 5 % a year. Old transformers after carrying out of corresponding certification could work 25 more years, but they frequently any more do not cope growing year from a year with needs(requirements) of muscovites for electric energy. Therefore Open Society " Mosenergo " carries out replacement of the old transformers which have been let out(which have been released) in 60-70, on modern - more powerful and reliable.
In total Moscow power company maintains in capital of 55 thousand in km of cables a pressure(voltage) 1-10 and also over 15 thousand transformer substations and distributive items(points) a pressure(voltage) 6-10 sq.
In 2004 the ejections into the atmosphere of pollutants from the enterprises OF JOINT STOCK COMPANY "Mosenergo - Moscow Regional Administration of Power System Management" were reduced by 14,5%
08.09.2004
Moscow
Are supplied the sums of the work OF JOINT STOCK COMPANY "Mosenergo -Moscow Regional Administration of Power System Management" on the protection of air pond in seven months of 2004. As a result of conducting of nature-conservation measures and abridging the use of solid fuel and petroleum residue the volume of the ejections of pollutants into the atmosphere of Moscow regionconsiderably was reduced.
In seven months of the present year as a whole on the power system thegeneral fuel consumption decreased in comparison with the analogous period of 2003 by 5,4%. Furthermore, reduction in the technogenic action on the environment it was possible to reach due to the conducting on the branches OF JOINT STOCK COMPANY"Mosenergo - Moscow Regional Administration of Power System Management" of the nature-conservation measures: the introduction of new equipment and advanced technologies. Moscow energy company runs the long-term ecological program ofgovernment g. Moscow, calculated up to 2010. In particular, at the power stations OF JOINT STOCK COMPANY "Mosenergo - Moscow Regional Administration of Power System Management" are established slightly toxic burners, the system of working liquid propellant and another power equipment with the higher ecological indices.
As a result in seven months of 2004 the summary volume of ejections from all power stations OF JOINT STOCK COMPANY "Mosenergo - Moscow Regional Administration of Power System Management" in comparison with the analogous period of past year was reduced almost by 14,5%, and on the Moscow OF TETS - HEAT AND POWER PLANT - it is more than25%.
The protection of environment is one of the main priorities of the activity of Moscow energy company. The share of natural gas in the fuel balance JOINT STOCK COMPANY of"Mosenergo - Moscow Regional Administration of Power System Management" constantly is supported at the high level, which to the big enough degree contributes to fruitful work on reduction in the ejections. In the last decade the energy company never exceeded the established ecological standards.
Informatizatsiya of "Mosenergo - Moscow Regional Administration of Power System Management"
translated - minor editing
Herald of "Mosenergo - Moscow Regional Administration of Power System Management", 29 (238) of 3 September, 2004.
The simultaneity of the process of production and electrical power distribution in the power systems imposes stringent requirements on the organization of control of the regimes of the work of basic equipment. When power systems were small, these questions were solved comparatively simply. In 60 - 70's the intensive building of power stations, the complicated- locked networks 110 - 500 kV led to the significant computational difficulties during the estimation of the current and planned regimes of the work electro and thermo-technical equipment.
The beginning of the application of electronic computing technology in JOINT STOCK COMPANY "Mosenergo - Moscow Regional Administration of Power System Management" is dated 1964, when it was obtained BY COMPUTER(S) "Ural-2", and group for its maintenance and automation of the calculations of the short-circuit currents and steady-state regimes in the electrical networks is created with the central service of protection. In 1968. they acquired even and machine "Ural-14".
On the base of this group during April 1969. as the independent enterprise of power system was organized information-computing center (IVTS) - the orders of the minister of power engineering and electrification OF THE USSR from 25.10.1968 g.; 230 and controlling Mosenergo - Moscow Regional Administration of Power System Management from 20.12.1968 g.; 430/I. Its director assigned dvadtsatidevyatiletniy the deputy chief of the planning section REU of Mosenergo - Moscow Regional Administration of Power System Management Yuri Dmitriyevich Artyukhin, and by chief engineer - Victor Ivanovich Agureyev, the former colleague OF NII - SCIENTIFIC RESEARCH INSTITUTE electronic computing technology, participated in the development by the newest domestic COMPUTER M-222.
Backbone IVTS they composed 30 specialists, worked on "Ural-2". They solved, that IVTS will engage the building of the second shop of sulfur removal TETs-12. Machine "Ural-2", as before, it ensured electro and thermo-technical calculations, and "Ural-14" - economic.
Considerable attention was given to the selection of personnel. In IVTS arrived the key personnel from services and enterprises in Mosenergo - Moscow Regional Administration of Power System Management, scientific research and design institutes.
As long ago as 1970. it proved to be, which "Ural-2" cannot manage by ever more complicated calculated tasks. Thus, in order to calculate short-circuit currents in the network 35 kV andabove it was necessary to divide its diagram into four-five parts. In spite of that, that the work was conducted twenty-four hour, machine unable was to carry out all tasks within the established periods. Therefore began preparation for the passage for the new generation OF COMPUTER(S) - M-222. In 1971. the number of personnel IVTS reached 286 people. During March of 1972 COMPUTERS M-222 it was obtained, and after two months it is put into use.
Development IVTS during the subsequent years followed the path of theswift growth of the circle of the decided tasks in the sphere of immediate dispatching, industrial and economic and production-engineering control, and so the service lives of computer technology. In short time was realized the passage to THE COMPUTER(S) of the type CM and EUROPEAN UNION. Since 1977. the means of computer technology the enterprises of power systembecame to be equipped. In 1980. into the industrial operation the information-operational complex of the automated system of the supervisory control of Mosenergo - Moscow Regional Administration of Power System Management is introduced.
The ninetieth years gave start to the transfer of firmware base into the personal COMPUTERS. For the short time interval were created local they were computationalthe networks of branches and corporate network, covering the branches of power system, located in Moscow and Moscow region: from Shatury and Kolomny - to Mozhaisk and Volokolamsk.
From the middle of the 90's the colleagues OF IVTS took active part in the introduction of the means of computer technology in control of technological processes at the power stations and the substations. Such functions of the systems of monitoring and control were broughtto the level of the standard solutions, as automatic regulation, remote control of equipment, relaying and automation, digital oscillography, the registration of events and so forth, etc.
Thus, already for a period of 35 years production activity IVTS covers the following basic directions of automation:
immediate dispatching control;
production-engineering control;
control of technological processes;
industrial and economic control.
Today in IVTS work more than 300 people. Regular service personnel of enterprise is formed from the specialists in the subject areas (electro and heat-power engineering, financial and economic, bookkeeping calculation, computing systems and network), which makes it possible to realize entire spectrum of the requiredtasks in the sphere of automation, beginning from their setting, the development of technological algorithms, the creation of applied software, concluding by its introduction and subsequent tracking in the generalboard and on the branches OF JOINT STOCK COMPANY "Mosenergo - Moscow Regional Administration of Power System Management". The technological independence of power system from the ambient conditions and the events is ensured thus.
Besides the creation of applied software on IVTS the responsibilitiesof operation and development of the local computational network of thegeneral board of society, covering it is more than 1250 work sites and more than 50 highly productive servers.
Automation of immediate dispatching and production-engineering control. JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of Power System Management" - the largest regional power system of the country, having powerful electric coupling with seven adjacent power systems. In its composition of 22 power stations with a summary installed capacity of 15000 MW, it is more than 500 substations 110-500 kV; the summary extent of air and cable electric power lines 35-500 kV -19800 km. The simultaneity of the process of production and electrical power distribution in this important power combine imposes stringent requirements on organization for long -, middle- and short term planning and operational control of the regimes of the work of basic equipment.
Independent of the forms of branch property and structure of operational control system-wide regime tasks remain, for realization of which is necessary the centralization of collection and data processing and, accordingly, computational process. First of all this relates to the optimization of load distribution between in parallel by the working generating aggregates, on the calculations of electromagnetic (short-circuit currents), electromechanical (dynamic stability) and been steady (steady-state stability, the flow distribution of active and reactive power), and also the optimization of the steady-state regimes of electrical networks according to the stress and the reactive power.
The settings of the devices of system-wide control are selected taking into account data of regimes and their permissibility: relaying and automation (RZA), the means of accident-prevention control, dispatcher claim fors input output of equipment are examined, number of which reaches 150 in the day.
Solution of system-wide problems is not conceived without the wide draft on funds of computer technology. Thus, the schematic of the substitution of the electrical network OF JOINTSTOCK COMPANY "Mosenergo - Moscow Regional Administration of Power System Management" for calculating the short-circuit currents is represented by the system of the linear algebraic equations 3000- GO of order, for calculating the steady-state regimes of basic electrical network -by non linear algebraic equations 1500- GO of order, finally, for calculating the dynamic stability - by nonlinear differential equations 5000- GO of order. Thus, the need of conducting the reliable and economical regimes of the workof equipment and power system as a whole was one of the main motives of creation IVTS.
At the present time it is developed by specialists IVTS, inculcated in the operation are accompanied more than 100 program set, ensuring planning and operational management of the regimes of the work of the basic thermo-mechanical and electrotechnical equipment:
the subsystem of immediate dispatching control (reception of the telemetric information at the level of central control room, its primary working and dostoverizatsiya, conducting daily dispatcher list, the control of the fulfillment of dispatcher graphs, the calculation of the balances of intersystem overflows, the operational forecast of consumption and generation, the determination of the positions of damage on the airlines 110-500kV from the indications of the fixing instruments and so forth, etc.);
the subsystem of production-engineering control (calculations of the settings of all types of devices RZA, the flow distribution of active and reactive power, static and dynamic stability, the optimization of flow distribution, thermal and electrical loads between the generating aggregates, the calculation of their technical and economic indices, processing the measurements of regime days, checking equipment to thermal and dynamic durability, etc.).
Automation of control of technological processes. The large complex of works is carried out in the region of theautomation of technological processes, as in the thermal, so electrical part, including the subsystems of commercial calculation (TETs-9, 11, 12, 20, etc., substation "Zubovskaya", "it is new -Mazilovo", "gorenki", etc.). With the direct and active participation of specialists IVTS in theperiod with 1995-2000. in JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administrationof Power System Management" is realized its kind technological"revolution", being consisted in the passage from the traditional systems for monitoring and control on the base of electromechanical and analogmeans to the contemporary microprocessor (digital)polnofunktsional'nym to the systems of real time, realizing the functions of the control of regime, the electronic registration of the parameters and events, automatic regulation, protection and automation, and program-logic remote control.
The complex of the executed works covered the following basic stages: the development of technical tasks, design is working, tuning and programming, adjustment, acceptance tests, putting to use. Because of this of the system of monitoring and control of all, newly planned or modernized within the framework of the capitalconstruction of energy and electric-net units, they are at present carried out only on the base of contemporary microprocessor systems for the worked out standard solutions. By the volumes of introduction and finished state of the solutions inthis region JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of Power System Management" occupies the leading position among AO- energy of the country.
The automation of industrial and economic control covers the spheres of financial and economic control and bookkeeping calculation. The united system of bookkeeping calculation is inculcated not only inthe general board, but also on it is more than 50- TI the branches OF JOINT STOCK COMPANY "Mosenergo - Moscow Regional Administration of Power SystemManagement". This system includes the following series of problems: the calculation of wages, basic means, intangible assets, material values, operations on the cashbox and the bank; summary calculation and the calculation of finance and accounting operations, etc.
Information nucleus is series of problems "calculation of finance and accounting operations". In it bookkeeping installations on all sections of calculation areaccumulated, and the necessary internal and external account is formed. Complex "summary calculation" ensures accumulation and data analysis about the financial-economic activity of enterprises, forming part JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of Power System Management". It provides for the collection of information from all branches OF JOINT STOCK COMPANY "Mosenergo - Moscow Regional Administration of Power System Management" for the formation of different consolidated reports and composition of the consolidated balance sheet, it makes it possible to obtain the following forms of accounting: form 1 and 2, cost accounting of the production of electrical and thermal energy, the estimate of expenditures for the production of energy and t.d.
The distinctive special features of the automated system of bookkeeping calculation are: the exception of duplicating information; all section of calculation use united reference books; there is a possibility of obtaining the analytical and currentdocuments with the necessary periodicity.
Strategy of development and improvement of computational process, conducted by the association IVTS, they are directed toward the solution of the following promising problems:
assignment to the required information in "real time", independent of the form of activity, be it industrial and economic, production-engineering or technological activity, which provides for the introduction of the contemporary of automation systems;
the creation of the corporate computer network OF JOINT STOCK COMPANY "Mosenergo - Moscow Regional Administration of Power System Management", including the united center of collection, working, storage, reserve restoration and the protection of system-wide data, the improvement of the united system of net addressing, routing and net control, making it possible to create guaranteed net information safety system.
the creation of the corporate information depository of data, ensuring effectiveness and transparency in control JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of Power System Management" independent of its structure: the vertically integrated company or the isolation of those generating, net, distributive and marketable companies;
conducting the regimes of the work of the basic equipment of powerstations and electrical networks taking into account not only technical, but also economic indices - association of the subsystems of immediate dispatching control and energy-marketable activity;
passage to the situation principle of the automation of control: "which will be, if... ", making it possible to act in advance, to forecast events, and not to assume the solution by the fact of the appearance of one or other event or another.
The HYDROELECTRIC POWER STATION - 1 of Open Society " Mosenergo " finishes installation
translated - minor editing
06.09.2004.
Moscow
On HYDROELECTRIC POWER STATION - 1 him(it). P.G.Smidovicha is conducted installation of new turbine R-12. The turbine will be started up in operation before winter colds.
Installation of the turbine is carried out(spent) within the framework of the scale program of equipment of HYDROELECTRIC POWER STATION - 1 by the newest high-efficiency equipment which realization is designed till 2008. Cost of works on installation of the new turbine, including expenses for auxiliaries, has made 135 million roubles. Financing was carried out completely from own means of the power company.
Turbine R-12 made by Open Society " Kaluga turbine factory ", has 12 MW; electric and 30 ; thermal capacity. New ; it is established instead of a developing resource of the first domestic ; the turbine working on HYDROELECTRIC POWER STATION - 1 since 1933. As a result of modernization the problem(task) of increase of reliability of supply of consumers by the electric power and a heat during the winter period as before HYDROELECTRIC POWER STATION - 1 capacity for passage of a maximum of loading has hardly sufficed will be solved. Since 2004 even more reliable and steady power supply of consumers will be guaranteed.
The HYDROELECTRIC POWER STATION - 1 provides with thermal and electric energy the Central district of Moscow, including such objects, as: the Kremlin, the State Duma of the Russian Federation, the Old area, ; the area. In total established capacity of HYDROELECTRIC POWER STATION - 1 him(it). P.G.Smidovicha makes 72,7 ;, the power station develops more than 395 million ; electric energy and releases(lets off) 2080 thousand. ; thermal energy in a year.
The HYDROELECTRIC POWER STATION - 1 - the oldest power station of Open Society " Mosenergo " - have been entered into operation on November, 28, 1897. In 1899-1900 the power station has provided with an electricity of a line of the first Moscow trams. Introduction began with HYDROELECTRIC POWER STATION - 1 in the Russian power of new technologies and the equipment, raising reliability and an overall performance of the power stations reducing their harmful influence on an environment. On August, 13, 2004 HYDROELECTRIC POWER STATION - 1 him(it). P.G.Smidovicha has been appropriated(given) the status of a monument of a history and culture.
On an official site of Open Society " Mosenergo " new service for consumers is created
translated - minor editing
06.09.2004.
Moscow
On an official site of the power company on the basis of the data of user's base of the Center of service of sales of energy of Open Society " Mosenergo " the section " Service for automatic definition of the address of branch " " and phone of the operator " is created. The created section represents the new service, called to simplify procedure of payment of the electric power by consumers.
The given service allows by means of a network "Internet" to the address of the subscriber to define(determine) a site and business hours of serving branch, phones of an infromation desk and the operator, and also the settlement account for filling the receipt on payment of the electric power. Service is intended for household subscribers of Moscow and the Moscow area.
Open Society " Mosenergo " aspires to make procedure of calculations for electric energy maximum convenient and easy for the consumers. For subscribers of the power company on an official site in section " Registration of payment " is possible to fill in the form of the receipt on payment of services of Open Society " Mosenergo ". In section " Automatic calculation of payment " is given an opportunity to calculate the sum (in view of the current tariffs and the privileges established in Moscow and the Moscow area), necessary for payment of the consumed electric power. In section " Questions and answers " experts of the power company answer the questions concerning manufacture, transportation and selling , help in the decision of the concrete problems arising at the organization of power supply of objects, payment of accounts, etc.
Open Society " Mosenergo " it is sure, that creation of the new unit on an official site of the company will allow to improve quality of service of subscribers and to simplify system of payment of the consumed electric power.
The management (manual) of Open Society " Mosenergo " has met situated near Moscow journalists
translated - unedited
25.08.2004.
Moscow
On August, 24 traditional session of a press club has taken place in Open Society " Mosenergo " with participation of management of the company and representatives of mass-media of the Moscow area. Dmitry Vasiljev, the assistant to the general director have taken part in it(him) on selling and work with consumers electric and thermal energy Vitaly Kuzmin, the assistant to the general director on distributive networks and to perspective development Alexander Mityaev, and also the
assistant to the general director on safety and a mode Ivan Sitkin the first assistant to the general director on a corporate policy(politics) and management of the property. The journalists who have gathered at a meeting represented over 40 electronic and printed mass-media more than from half of municipal formations(educations) of Moscow suburbs.
Key theme of discussion became reforming Open Society " Mosenergo ". Answering questions of journalists, Dmitry Vasiljev has declared, that reforming of the power company - a unique way for today to avoid an energy crisis in Moskovsk region. " The means, pawned the companies in tariffs, do not suffice on adequate development of a power supply system. If to change nothing, by 2008 we can collide(face) deficiency of power capacities. That it to not admit(allow), it is necessary for us urgently, but not in damage the consumer and to shareholders, to reform Open Society " Mosenergo ", - has noted Dmitry Vasiljev. As he said, realization of the plan of re-structuring of the company developed by management will make its(her) attractive to domestic and foreign investors which means it will be possible to direct on the decision of a problem the energy-scarcity and updating of capacities.
At a meeting problems of the current activity of the company have been mentioned also. Vitaly Kuzmin has expressed concern the increased debts of the enterprises - ïåðåïðîäàâöîâ of the Moscow area. " For last six months "the resellers" have run into debt Open Society " Mosenergo " more than 3 billion roubles and continue to accumulate a duty. In conditions of repair campaign and process of preparation of fuel to a cold season such situation with duties causes in us extreme concern ", -
Vitaly Kuzmin has noted.
The main reason of growth of debts that the enterprises pay off for consumed energy under the "preferential" tariffs illegally established for them by Power committee of the Moscow area. " There is a paradoxical situation - the resellers buy from us energy almost in 2 times below its(her) cost prices, i.e. actually receive profit due to all other consumers ", - Vitaly Kuzmin has noticed. It(he) sees the decision of a problem in change of system of power supply of consumers of area. "
The college of Mosenergo is ready to new academic year
translated - unedited
30.08.2004.
Moscow
The first not state educational establishment " College of Mosenergo " accepts 174 students who sustained introductory tests both have acted(arrived) on economic and power branches. Competition in 2004 has made 3 persons on a place.
New academic year for the " College of Mosenergo " - anniversary. In 1989 the first professional liceum in Russia has been created, and in 1992 it(he) became branch of the Moscow power supply system. Subsequently has received the status of college. On day time branch more than 600 person today is trained. Besides about 300 workers of Open Society " Mosenergo " raise the qualification or pass retraining on correspondence branch of College. For 15 years of the activity the College has prepared about 3 thousand experts, 70 % from which work now in system of Open Society " Mosenergo ". To all graduates it is assisted in employment in branches of the power company.
The Moscow power supply system supports to College, and to students gives an opportunity to pass an industrial practice at the enterprises of the power company. The best students are awarded with nominal grants of Open Society " Mosenergo ".
The one of few educational institutions prepares for " College of Mosenergo " ìàøèíèñòîâ boilers and steam turbines, electrical engineers on maintenance service of power stations and electric networks, electromechanics on repair of the equipment of power stations. Technics(technical equipment) of a power structure are issued as experts on operation of an electric equipment of power plants, networks and heat power installations, a heat supply and òåïëîòåõíè÷åñêîìó to the equipment, automatic control of electrotechnical systems and technological processes of thermal power plants. On specialities " the economy and book keeping in power " and "management" prepare technics(technical equipment) of an economic structure.
The college is known for high scientific potential of the teachers and good technical equipment. Training highly skilled experts, among which carry out 14 candidates of sciences.
The " College of Mosenergo " plays the important role in the Moscow power system. Last years in Open Society " Mosenergo " serious steps on introduction in manufacture of high technologies and the modern equipment are made. The computer technics(technical equipment) is widely applied, the automated control systems covering work of all industrial services of power stations are created. All this demands a high professional standard ýíåðãåòèêîâ, many of which - graduates of College of Mosenergo.
From October, 11 till October, 20 in college will pass celebratory anniversary actions with participation of educational institutions of Russia and the countries CIS.
On August, 26 hot water will act(arrive) in apartments of all Muscovites
translated - unedited
26.08.2004.
Moscow
The basic stage of preparation of thermal networks of Open Society " Mosenergo " to passage of a îñåííå-winter maximum of loadings is finished. On August, 26 hot water supply will be renewed in apartments of all Muscovites.
Îïðåññîâêà thermal lines (check of pipes on durability and density) this year began on May, 10. Term of carrying out of repair work on sites of pipelines in each separate area of Moscow traditionally makes 21 day. During this time the worn out sites in thermal networks come to light and eliminated.
For the period of years(summer) repair campaign of 2004 in heating systems 4700 shabby sites have been revealed and eliminated. For their revealing in thermal networks hydraulic tests at which on separate sites of the main pipeline the pressure exceeding settlement in 2 times (till 24-30 àòì is created for a while are annually carried out(annually spent).). Thus, defective sites that allows to provide a high level of reliability of a heat supply during the heating period in due time come to light. It is necessary to note, that due to work spent by Open Society " Mosenergo ", for last years the quantity(amount) of failures in thermal networks has considerably decreased during passage of a îñåííå-winter maximum of loadings.
Now temperature tests of thermal networks during which the temperature in heat conductors at 2 o'clock raises up to 135 °Ñ are carried out(spent). These checks allow to prepare thermal networks for a îñåííå-winter cold season. Open Society " Mosenergo " continues to carry out(spend) complex tests of íàñîñíî-pumping over stations which will be prolonged till September, 10. It is necessary to note, that these actions pass without switching-off at consumers of hot water.
In 2004 within the framework of programs of repair and reconstruction replacement of pipelines of 85 km has been stipulated. Improvement of quality of a heat supply was promoted appreciably by introduction of new technologies. In particular, since 2003 of Open Society " Mosenergo " has adjusted manufacture of pipes in ïåíîïîëèóðåòàíîâîé isolation which differ a high level of reliability and durability of operation (40-45 years). The annual plan had been stipulated a lining of similar pipes of 10 km. Besides during the repair period of Open Society " Mosenergo ", as well as the last years, continued replacement ñàëüíèêîâûõ equalisers on ñèëüôîííûå, that will allow to reduce outflow of network water and to lower thermal losses. On repair and reconstruction of thermal networks in 2004 the company it has been allocated 3650 million roubles.
The centralized heat supply from thermal power station in Moscow exists already more than 70 years. Due to this system the capital is relieved of necessity of use of the numerous uneconomical boiler-houses polluting an atmosphere of city. But in due course miscalculations accepted many years of back concept of the central heating directed on reduction in price of thermal networks due to deterioration of their quality affect. Now deterioration of the equipment in thermal networks reaches(achieves) 35 %. Therefore priority for today there is qualitative diagnostics of the established equipment of thermal networks
"MOSENERGO - MOSCOW REGIONAL ADMINISTRATION OF POWER SYSTEMMANAGEMENT" at the annual equator: stability to convert into the effectiveness
Herald of "Mosenergo - Moscow Regional Administration of Power SystemManagement", № 26 (235) of 13 August, 2004.
On 6 August took place the staff conference of company, on which were supplied the sums of the work OF JOINT STOCK COMPANY"Mosenergo - Moscow Regional Administration of Power SystemManagement" in 6 months of the present year. With the basic report came out the deputy chief engineer on theelectrotechnical part Vadim Zinakov.
The total of the half-year: the users of Moscow region were ensured by heat and electric powerfully, it is stable and without interruption, without the introduction of the graphs of limitations and turning offsfor lack of power.
Given in THE I half-year of 2004. they are brought in the comparison with the last year's indices duringthe same period.
Production and the consumption of energy and power
The working power of all power stations was 12375 MW. This on 585 MW is higher than the planned value and on 100 MW lowerthan the level of past year - as a result of the repair of chimneystack № 2 at GRES $$RTGR3S - State Regional Electric Power Plant -5. Planned working power they exceeded TETs-22 (71 MW), TETs-25 (68 MW), TETs-26 (65 MW), TETs-21 (60 MW), Gray (48 MW).
Power stations produced 36,7 billion kVt·ch of electric power, which is lower than the plan by 4,1 % and for 3,7 % lower than thelevel of past year because of unloading of equipment in accordancewith the tasks RDU.
Electric requirements of its own users relative to the current planand the level of past year increased respectively by 1,8 % and by 3,2%. Were stocked up 4 billion kVt·ch of electric power on the wholesalemarket.
Grew the consumption of electric power by commercial and budgetaryusers, by the electrified transport, by the reselling organizations of Moscow region. At the same time, industry and especially the population to consume of electric powerthey began less.
The losses of electric power were preserved practically at the lastyear's level. It was possible to attain the savings of 43,1 million kVt·ch, to what special measures contributed, carry ouied in electric-net branches:
- the transfer of loads and turning off of the unloaded transformers -11,0 million kVt·ch;
- reduction in the expenditure of electric power for its own needs ofnet substations - 26,3 million kVt·ch;
- the reconstruction of distribution networks - 5,8 million kVt·ch.
Dynamism in the development of the disregarded electric powerconducted energy-sale. By this branch it was carry ouied 1201 raids, and as a result are revealed 23,93 million kVt·ch of the disregardedelectric power. 532 additional raids were carry ouied together with electric-netbranches and S, are revealed 3,17 million kVt·ch of embezzlements and disregardedelectric power.
From the collectors of power stations it is tempered by 40,8 milliongcal of thermal energy, which is higher than the plan by 2,8 %. In comparison with the past year reduction in the heat distributioncomposed 6,8%, which is caused by the higher temperature of surrounding air. The useful leave to heat-energy in the pair and the hot water was 37,9million gcal, or to 8,5 %, it is less, than in the past year because of reduction in the consumption on allgroups, besides wholesale resellers and public utilities and amenities.
Fuel-use and the fuel-guarantee
The actual specific expenditures of fuel comprised for the productionof electric power 246,8 g/kVt·ch, to the calorification - 166,1 kg/Gcal with those planned, accordingly, 252,9 g/kVt·ch even 167,1 kg/Gcal. The specific expenditure of fuel for electric power was reduced on 1g/kVt·ch in essence because of an increase in the portion of electricenergy generation during the thermal consumption to 1 %, which is explained by regime factors. The specific fuel consumption grew, since the portion of central heating production (because of thereduction of thermal loads in the pair and the hot water) and averageelectrical loads (unloading equipment on the indication RDU) werereduced, but more than fuel began to be burnt.
Summary excessive fuel consumption because of the deviation from thestandard of primary technical and economic indices is absent, however, still there is a reserve of the vacuum, on the heat losses with the mechanical incomplete burning, on the unplanned launchings and the stops of equipment, overexpenditure on which comprises on 0,1 g/kVt·ch. On remaining primary TEP the excessive fuel consumptions are absent orare located on the level of the hundredth of gram. The savings 0.2 g/ is obtained according to the expenditures ofelectric power for its own needskVt·ch.
Safety
Like year ago, in JOINT STOCK COMPANY "Mosenergo - Moscow Regional Administration ofPower System Management" is not fixed major emergencies. Concerning incidents, that in their this year occurred less (3112 against 3532).
Increase in the incidents by 15,1%. it is observed only at power stations (90). This the so-called technological disturbances, and in essence they occurred because of the larger frequency of thesurface damages of heating in the boiler shops.
Indices on the thermal networks encourage. The calculation of incidents carried out employing new procedurerevealed sharp reduction in the unhappy situations - 18 against 221. To 16% less it occurred incidents in the electric brushes, to 2,8% V OF S.
One fire occurred in 6 months of 2004 in the power system. On 7 May on PS № 505 Beskudnikovo of main electrical networks becauseof the internal damage of the transformer TDGK of 10 kV № 8 there wasthe ejection of oil with subsequent burning of transformers DGK № 1and DGK № 8. Proved to be damaged the cables of second commutation, occurred turning off AT -6 from the gas shield. Fire they liquidated after half-hour, without disconnecting users.
At the same time, in the first half-year on the branches occurred 10 accidents against 4within the same period of past year. A sharp increase in the traumatism is caused, in particular, by the incident on 31 March, 2004, when into the maintenance crew of the cablemen OF MKER cut intopassenger automobile, driver of which did not manage control. It suffered 4 people.
The capital construction
Results OF THE I half-year on the capital construction are publishedin 24 numbers of "herald".
The most important tasks to the second half-year are:
- the replacement of the turbine № 29 on Gus -1 with a power of 12 MW;
- the modernization of turbine № 5 on TETs-20 with an increase in thepower on 25 MW;
- the padding 8,2 km of thermal networks;
- introduction PS anniversary into the southern electrical networks -80 thousand. kcVa and PS Chkalovsk with the approaches in the October electricalnetworks - 160 thousand. kcVa;
- the introduction Of businovskoy NPS.
Repair of the equipment
Within the framework of the preparation for thermo-mechanicalequipment for the load peak it is planned to repair (and partiallythis is already made) 14 power units, 26 energy boilers, 24 turbogenerators, 1 hydro-turbine, 15 peak hot-water boilers. The repair of auxiliary central heating equipment is produced.
The repair of electrotechnical equipment is conducted at the powerstations without the delays.
The innovation repair of heat-mains in the thermal networks isexecuted to 65,8% of the planned volume. The preparation of capital power system for the autumn-winter seasonassumes also the required testing of thermal routes. Hydraulic tests are today carry ouied and maintenance is more than1468 km of conduit - 66% of all thermal networks.
In the high-voltage and distribution networks plan with respect to theoperational servicing of networks, to innovation repair LEP substations it is carried out according toall indices.
In S the repairs of cable lines also occur according to the plan andit is very effective, which reflects the index of reduction in the summary about thepresence of the damaged cables per 344 units. Are substituted 138 overloaded transformers, rekonstruirovano 17 overloaded substations with the replacement by thetransformers of larger power.
In VKS on the cable lines 110 - 500 kV are executed 86 (of 150according to the plan) the repairs of lines, the having defect shells. Is finished the innovation repair of the aggregate of maslopodpitkiAPU № 3 C of 220 kV Sviblovo-Vladykino, Butyrki-Vladykino, is completed work on the innovation repair of collector"Tschaikovsky".
Wages and the regular service personnel
In THE I half-year in the industrial sector of power system wereoccupied 45046 man, including in the industrial-production sphere - 42071 man. Average monthly wages of personnel in the industry was 17893 rub, it grew by 13%.
On all branches of vyplacheny of reward on the sums of work in yr andfor the length of service. As a result of increasing the wages from 1 April, 2004, it waspossible to carry out tariff agreement in THE I half-year of 2004. Today the tariff rate of the worker of the first discharge isestablished in the amount of 1873 rub.
One should with the regret establish, that in the power system grows the fluidity of working personnel, in this case as the basic tasks in the work with the personnel to THEII half-year of 2004 they are considered an improvement in theselection of personnel, further strengthening of working and production discipline, the improvement of control system of personnel.
Prime cost, profit and the debts
In comparison with THE I half-year of 2003 the rise in price of primecost was 6,5 billion rub, or 21,1 %. The prime cost of electric power grew by 19,6 %, heat-energy to 23,8 %.
It is caused, first of all, with an increase in the expenditures for fuel- and on the remunerationfor labor, by an increase in the amortization, other material and cash expenditures, expenditures on the services TO JOINT STOCK COMPANY RAO THE "EES OFRUSSIA", JOINT STOCK COMPANY OF "FSK", JOINT STOCK COMPANY "SO- TSDU YEES", PRIVATELY HELD COMPANY "TSDR FOREM".
Expenditures for repair maintenance as a whole on JOINT STOCK COMPANYof "Mosenergo - Moscow Regional Administration of Power SystemManagement" were 6,9 billion rub, which composes 58,4% of annual plan.
The leave to the commodity production (without NDS) increased 45,6billion rub, which is caused by an increase in the sredneotpusknykh tariffs on theenergy and by an increase in the useful leave to electrical energy. To 6,3 billion rub. (16,8%) grew payment to energy.
Profit from sales was 7345,1 million rub, including from sales to electrical and thermal energy - 7276,7 millionrub.
Taking into account operating and extra-realization expenditures, profit to the taxation of society is equal to 872,5 million rub.
After the payment of tax to the profit and other required payments theloss of society was 285,2 million rub. At that time, as during the same period of 2003. the clean profit JOINT STOCK COMPANY of "Mosenergo - Moscow RegionalAdministration of Power System Management" was 1307,6 million rub.
Reduction in the clean profit is connected with an increase in the taxby the property because of the absence of affirmed up to now by thegovernment of the Russian Federation of enumeration l'gotiruyemogoproperty for calculating the tax, by the addition of the reserve of doubtful debts as a result of theinventory of debts, on which elapsed the period of limitation of actions and competitiveproduction is completed.
Debts of the users of electrical and thermal energy c by thecalculation of delivery on FOREM (without NDS) grew as a whole by 20 %(from 5,8 to 7,0 billion rubles). Predominantly this occurred due to an increase in debts of its ownusers of electric power, since the debts of the wholesale user- resellers of electric powerincreased, and also enterprises in industry and Defense Ministry.
But here the debts of the users of thermal energy was reduced sincethe beginning of the year by 63,6%.
The debts of the users of Moscow was reduced on 50,1 % due to thepay-off of debts of the users of thermal energy by 69 %. Debts of its own users for the electric power in this case grew by23,6%.
The debts of the users of Moscow region grew by 106,1%, including for the electric power - to 117,1%. Debts of the users of thermal energy was reduced by 7,8%.
Debts for the electrical energy in 6 months of the present yearpresented on FOREM was reduced from 595,3 million rubles to 564million rubles, or to 5,2%.
Reduction in the accounts payable of the society is observed on anumber of positions:
- for the fuel-, capital construction and operational-maintenance - to 4,2%;
- to the suppliers of fuel - to 27,6%, including to suppliers of gas to 58%;- on the capital construction - to 35%.
Increase in the debts for the operational-maintenance works to 101,7million rubles, or to 7,3 %, it is caused by an increase in the current debts using the innovationrepair and the materials in connection with the preparation of powersystem for the repair campaign.
Thus, before the society at the moment of the intersection of annual equatorit stands many tasks, among them and an increase in the economic effectiveness, and an improvement in the repair- reducing activity, and the solution of cadre problems. But the main thing to the second-half of year is traditionallypreparation for the forthcoming autumn-winter load peak. In this connection to the leaders of all levels it is necessary toorganize clear work in accordance with the planned targets, to strengthen quality control and with the periods of theirperformance, and also to strictly soblyudat' financial discipline.
Edward Poret
In THE I half-year of 2004 for the debtors OF JOINT STOCK COMPANY of"Mosenergo - Moscow Regional Administration of Power SystemManagement" are produced claims on the sum more than 5 billionrubles
translated - unedited
18.08.2004
Moscow
In the first half-year of 2004 for the debtors OF JOINT STOCK COMPANYof "Mosenergo - Moscow Regional Administration of Power SystemManagement" were produced 8 156 claims on sum total more than 5billion rubles. As a result of their examination of company it was possible to obtain3,2 billion rubles. Today in the stage of examination 3 996 claims are located. To the society were produced 19 claims on the sum of 20 millionrubles, from which it was satisfied by 7.
From January through June of the present year JOINT STOCK COMPANY of"Mosenergo - Moscow Regional Administration of Power SystemManagement" it produced for its debtors 368 actions for the sum of 894million rubles. There were satisfied 307 actions for the sum of 532 million rubles. In the stage of examination the 200 additional matters are located. As a result of the implementation of judicial decisions by companywere obtained 439 million rubles.
By the juridical service JOINT STOCK COMPANY of "Mosenergo - MoscowRegional Administration of Power System Management" is carried outscale work for the purpose of the penalty of debts from theorganizations, financed from the federal budget. To the debtors of this category are produced 143 actions for the sumtotal of 437 million rubles, from them were completely satisfied 120 actions.
The colleague OF JOINT STOCK COMPANY of "Mosenergo - Moscow RegionalAdministration of Power System Management" is honored the State Prizeto the Russian Federation for the young scientists for the salientworks in the area of science and technology
translated - unedited
17.08.2004
Moscow
On 13 August President of the Russian Federation Vladimir Putin signededict "about awarding of the State Prizes to the Russian Federation of2003 for the young scientists for the salient works in the area ofscience and technology". Together with other scientists of this reward was honored thecolleague OF JOINT STOCK COMPANY of "Mosenergo - Moscow RegionalAdministration of Power System Management", Candidate in Technical Sciences Dmitriy Buyakov for the work "study ofheat-mass transfer and hydrodynamics of multicomponent solutions withthe demineralization of natural and effluents". This work was written in the co-authorship with the scientific workerof the Moscow Power Engineering Institute by novel by Agapov and thechief specialist OF RAO THE "EES OF RUSSIA" by Yuri Shkondin.
Reward was founded in 1994 for purposes of the development of thescientific potential of country and stimulation of the creativeactivity of young scientists. Yearly State Prizes for the young scientists for the salient works inthe area of science and technology are awarded by the President'sDecree of the Russian Federation: for scientific studies, contributing the salient contribution to development of natural, the technical and humanities; for development and mastery of foremost technology, materials and the technologies of new generation, the ensuring increase rates and effectivenesses of economicdevelopment, strengthening the defense capability of the country.
Dmitriy Buyakov works as the chief engineer of theproduction-engineering division JOINT STOCK COMPANY of "Mosenergo -Moscow Regional Administration of Power System Management". This is not the first acknowledgement of the scientific merits ofyoung specialist. In 1998 Dmitriy Buyakov obtained the allowance of the President RF, and in 1999 the allowance of firm Siemens for the works on the themeof the "special features of water treatment for the steam-gas thermalpower station".
In the scientific labor of young scientists the results of long-terminvestigations in the region of the special preparation of water forits use in the technical cycle of station are represented, and also processing effluents. Practical realization of ideas, presented in this work, it will make it possible on the base of domestic manufacture to createcontemporary technologies for the ecologically clean thermal powerstations
Gus -1 by them. P.G. Smidovicha JOINT STOCK COMPANY of "Mosenergo - Moscow RegionalAdministration of Power System Management" is acknowledged as thehistorical monument
translated - unedited
17.08.2004
Moscow
On 13 August, 2004, the mayor of Moscow Yuri Luzhkov signed orderabout the adoption under the state protection of more than hundredarchitectural ensembles, the monuments of old times, the works of sculpture, in order to ensure their safety and proper use. They are related to the objects of the cultural heritage of regionalvalue and they will be included in united state list. Among the monuments of history and culture - Gus -1 JOINT STOCKCOMPANY of "Mosenergo - Moscow Regional Administration of Power SystemManagement".
Gus -1 by them. P.G. Smidovicha, previously MoGES (Moscow urban power station) - oldest of thenynedeystvuyushchikh power stations of Russia. It was put into use on 28 November, 1897, on the order of emperorAleksandr III. In the design of building participated great Russian architect IvanZholtovskiy. MoGES became the first Moscow station, which illuminated city, it supplied its transport economy and industry with electric power. Specifically, from this power station, the located in the center capital, the creation of Moscow power system began.
The today installed capacity of power station is 72,7 MW. Gus -1 ensures the central region of Moscow with thermal andelectrical energy, including - Kremlin, State Duma, Old and Lubyanka areas. Today Gus -1 - one of the very ecologically clean stations OF JOINTSTOCK COMPANY "Mosenergo - Moscow Regional Administration of PowerSystem Management". The natural gas is used as the basic and reserve fuel on it. The unique boiler of domestic manufacture is established at thestation, which is the best boiler in its class. It is considerably more effective than foreign analogs according tothe ecological indices, and its productivity is one and a half times higher. In recent years on Gus -1 to 90% is substituted electrotechnicalequipment, unique water-treatment installation is inculcated, instead of the old turbogenerators are established new, developed on the quite advanced technologies. All this allowed enterprise to considerably improve technologicalprocess. In 2004 the introduction of the new turbine No 29 is planned with apower of 12 MW.
Building on The raushskoy embankment rightfully is acknowledged as theobject of cultural heritage. The history of station is tightly connected with the history of ourcountry. Building Gus -1 was the witness of revolutions, it survived two world wars, fires and flood. Last large flood occurred in the beginning of past century. In the memory about this event at the entrance to the station into thewall is embedded metallic plate with the inscription "the level ofspring vod". 12 April 1908.».
Special document will be designed with obtaining of status of themonument of culture to the building of power station and memorableboard is placed. According to new status, JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration ofPower System Management" is obligated to agree on all changes, being concerned Gus -1, with the main administration of the protection of the monuments ofMoscow.
TETs-16 JOINT STOCK COMPANY of "Mosenergo - Moscow RegionalAdministration of Power System Management" is conducted thereconstruction of equipment, intended to increase the ecological parameters of operation of thestation
translated - unedited
17.08.2004
Moscow
Toward the end of 2004 on TETs-16 JOINT STOCK COMPANY of "Mosenergo -Moscow Regional Administration of Power System Management" will becompleted the reconstruction of the knot of the neutralization of tailwaters. Furthermore, it is planned to also modernize construction on removal ofneftemasloproduktov.
In the technological cycle OF TETS - HEAT AND POWER PLANT a largequantity of water is used. At the station it passes several steps of the cleaning: it is clarified, it is filtered and is demineralized. In the course of time filters, in which are accumulated salt connections, they are clogged, and them must be cleaned by water with the addition of specialreagents. Discharge water enters the knot of neutralization, where the level of its acidity and alkalinity is led to the normalvalues. In the course of reconstruction the established on TETs-16 knot ofneutralization will be fully automated. The similar system of the automation of control and monitoring it isplanned to establish on the construction on removal ofneftemasloproduktov from water. As a result of reconstruction will increase the efficiency and thereliability of the operation of cleaning construction TETs-16.
Besides this at the station it is planned to put into service newartesian well, from which power engineering they will obtain salt brine for thesoftening of water, supplied to the main central heating conduits. The method of obtaining the salt brine of the natural undergroundsources adapts on TETS - HEAT AND POWER PLANT OF JOINT STOCK COMPANY"Mosenergo - Moscow Regional Administration of Power SystemManagement" already more than ten years. Earlier into the net water was added common salt, which required additional expenditures for transport and storage ofthe reserves of salt. Only to one TETs-16 yearly it was necessary to reach to 300 t. common salt per year. Therefore to much more simply and more economically obtain finishedbrine from the salt layer, located on the depth 1,3 - 1,5 km.
The protection of water basin in Moscow and Moscow region enters intothe number of priority tasks OF JOINT STOCK COMPANY "Mosenergo -Moscow Regional Administration of Power System Management". For retaining the ecology of region the energy company yearly conductson its branches modernization and reconstruction of equipment, directed toward reduction in the water consumption, an improvement in the quality of effluents and an increase in theeffectiveness in the work of cleaning construction.
JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of
Power System Management" is planned to inject in g. To zelenograde information- technological network on basis of PLC-
technologies
translated - unedited
10.08.2004
Moscow
JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of
Power System Management" works out project on the creation of
information- technological network, built on basis of PLC- technologies. New network is intended for the solution of its own technological
problems of power system.
The high efficiency of the designed information- technological network
in many respects is determined by application of PLC- technologies. JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of
Power System Management" is occupied by finalizing principles and
technologies of the construction of information- technological network
on basis of PLC- technologies since 2001. Tests are conducted on the base of the 19th region of the Moscow cable
system (S) of energy company in g. To zelenograde. Today information- technological network, operating g. Zelenograd, has extent of approximately 62 km. In the city the range acts, including 18 distributive and transformer substations.
The constructed network will make it possible to substantially
increase reliability and quality of the field service of energy
company. First of all, with its aid the energy-economy because of the optimization of the
regimes of the work of power equipment in the day and night time of
day considerably will increase. The introduction of information- technological network will make it
possible considerably to economize electric power due to the reduction
of transformer losses in the regime of idling in the night time. On the calculations of the specialists of energy company, as a whole on the 19- ohm to region S in g. Zelenograde savings will compose to 160 MVt·ch of electric power.
Within the framework of new project is developed also technical task
on the creation of the automated system of control and calculation of
energy consumption (ASKUE). New system will help power engineers to fight with the unsanctioned
connections to the networks and the nontechnological losses of
energy-power. With the aid of ASKUE on basis of PLC- technologies the specialists OF
JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of
Power System Management" can also carry out the more detailed and more
operational analysis of the supply of users. The balance of the set and consumed electric power will be carried out
maximally accurately, which is especially urgent upon transfer into the market conditions
for power supply. Information about the consumption of electric power and the state of
the equipment of networks will enter the control room automatically,
also, into the shortest periods.
Technology PLC (Power Line Communication) - new telecommunication
technology, being been based on the use of power electric brushes for the
high-speed exchange of data carriers. One of the major advantages PLC is that, that for introducing the new system is not required the creation of
additional infrastructure, since wiring exists in any building and accomodation. Actually PLC- technology converts electric power lines into the
transmission network of data. Any another cannot be compared from the point of view of prevalence
and accessibility of finished infrastructure with the power network. Electrical rosettes exist in each house even in the most distant
corners of the terrestial globe. PLC- technology can be used, also, for control of technological
processes in the power system, and for the connection of everyday users to the Internet, IP- telephony and to other telecommunication services.
In the course of the realization of project during 2005-2006 with the
aid of PLC- technologies it is planned to enlarge network, after including in it 327 additional distributive and transformer
substations in g. To zelenograde. In the future the system will make it possible to automatically switch
the regimes of the work of the counters of the calculation of electric
power in users depending on the time of day and to check counter
readouts directly from the control room of the energy-sale JOINT STOCK
COMPANY of "Mosenergo - Moscow Regional Administration of Power System
Management".
The technology of the transfer of data and voice along the electric
power lines actively takes root in the western countries during the
last six years. JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of
Power System Management" became the member of international
association "PLCforum" in 2001. Within a comparatively short time for the specialists of energy
company it was possible to approach the production of equipment on
base PLC- technologies and to develop the unique solutions, which obtained acknowledgement at the international level. Today JOINT STOCK COMPANY of "Mosenergo - Moscow Regional
Administration of Power System Management" occupies foremost positions
on application of PLC- technologies in the sphere of the maintenance
the needs of power system.
JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of
Power System Management" created sufficient reserves of solid fuel for
the passage of the forthcoming heating season
translated - unedited
10.08.2004
Moscow
Yearly within the framework of preparation for the passage of the
autumn-winter load peak JOINT STOCK COMPANY of "Mosenergo - Moscow
Regional Administration of Power System Management" are created fuel
stocks, necessary for the work of power stations. In the first half-year of 2004, in spite of a considerable increase the prices of the solid fuel, the actual fuel stocks of energy company exceeded the task TO RAO OF
THE "EES OF RUSSIA" for 5% with respect to the petroleum residue and
for 2% on coal.
The billet of the reserves of coal is complicated by unfavorable
situation, prevailing on the market for working media in the course of the recent
months. Prices of coal, and also the fuel mazut in the first half-year of 2004 they grew
respectively in 1,1 and 1,5. In this case for capital power engineers it is necessary to compete
with the users of the European countries for the deliveries to
production from the Kuzbas coal field.
Furthermore, in 2003 was liquidated the enterprise OF JOINT STOCK COMPANY
"tulaugol'", provided for the deliveries at GRES $$RTGR3S - State Regional Electric
Power Plant -5 and TETs-17 the Moscow power system of brown Moscow
coal. Therefore energy company is forced to transfer its power stations to
the use of Kuzbas raw material. Today the experimental combustion of coal, reached from the Kuznetsk coal field, they are carried out TETs-17 JOINT STOCK COMPANY of "Mosenergo -
Moscow Regional Administration of Power System Management". At GRES $$RTGR3S - State Regional Electric Power Plant -5 after trial
combustion Moscow coal was substituted in 2003.
In the fuel balance JOINT STOCK COMPANY of "Mosenergo - Moscow
Regional Administration of Power System Management" the large part (of
about 93%) composes the natural gas. Gas fuel- is more ecologically clean, and furthermore its use is more profitable from an economic point of
view. However, for the reliable passage of the autumn-winter load peak of
energy company it is necessary to create the additional reserves of
the reserve forms of fuel, which are used for the power production in the case of sharp reduction
in the temperature of air. JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of
Power System Management" completely manages the task with respect to
the creation of fuel stocks, which will make it possible to ensure the reliable and uninterrupted
power supply of users during the forthcoming heating season.
JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of
Power System Management" totaled of the activity of company in the
first half-year of 2004
translated - unedited
06.08.2004
Moscow
In JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of Power System Management" on 6 August, 2004. staff conference took place. With the report about summing up of the results of the work of energy
company in the first half-year of the present year came out the deputy chief engineer on the electrotechnical part JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of Power System Management" Vadim Zinakov.
Since the beginning of 2004 the power stations OF JOINT STOCK COMPANY "Mosenergo - Moscow Regional Administration of Power System Management" produced 36,7 billion kVt·ch of electric power. Electric requirements of its own users in the first half-year of the present year to 3,2% exceeded the level of past year. The consumption of electric power increased in essence due to the commercial and budgetary subscribers. For guaranteeing the growing electric requirements of the Moscow region JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of Power System Management" during the first half-year
of 2004 stocked up 4 billion kVt·ch of electric power on the wholesale market.
From the collectors of power stations in the first half-year of 2004 it is tempered by 40,8 million gcal of thermal energy. In comparison with the past year reduction in the heat distribution composed 6,8%, which is caused by the higher average-daily temperature of surrounding
air.
In six months of 2004 the leave to the commodity production (without NDS) was 45,6 billion rubles. The leave to commodity production increased due to an increase in the sredneotpusknykh tariffs on the energy, and also increase in the useful leave to electrical energy. Increase in the useful leave in comparison with the analogous period of 2003 was 9,4 billion rubles, or almost 27%. Profit from sales to commodity production comprised more than 7 345 million rubles.
On the sums of six months of the present year after the payment of tax to the profit and other required payments the loss JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of Power System Management" was about 285 million rubles. Within the same period of 2003 clean profit was 1 307,6 million rubles. Reduction in the profit of energy company is connected, including with the fact, that up to now government RF not affirm the enumeration of property, with taxation of which are allowed the privileges. As a result sharply grew the payments JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of Power System Management" on the tax by the property.
Since the beginning of 2004 debts of the users of electric power taking into account delivery for the wholesale market for electric power grew by 20% (to 7 billion rubles). An increase in debts for the electrical energy is caused first of all by an increase of the debts of the wholesale user- resellers of electric power, and also enterprises in industry and Defense Ministry. At the same time debts of the users of thermal energy was reduced by
63,6%.
On TETs-26 was established the first in JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of Power System Management" elegaz sulfur hexafluoride switch with a power of 500 kV
translated - minor editing
30.07.2004
Moscow
On 22 July, 2004, on TETs-26 JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of Power System Management" was put into use elegaz sulfur hexafluoride switch 500 kV. New switch is characterized by the higher level of reliability and
safety, and also has the practically unlimited period of service.
Until recently on TETs-26 were established only air circuit breakers 500 kV of domestic manufacture. To repair of one of such switches of energy company it would be
necessary to spend in the present year of approximately 5 million rubles, i.e., almost so many, how much costs new elegaz sulfur hexafluoride switch. Therefore management JOINT STOCK COMPANY of "Mosenergo - Moscow
Regional Administration of Power System Management" accepted the solution about the purchase of the elegaz sulfur hexafluoride switch of Swedish firm "AVV" (ABB ?) . Switch was established into the shortest periods - for its installation and the adjustment TETs-26 were required only four days.
Electrical switches are one of the most important equipment components in the systems of power supply and the distributive electrical networks. They are intended for the break of electrical chain and arc extinction
short-circuit current appearing in this case. Elegaz sulfur hexafluoride switches, in contrast to oil used earlier and air, are more reliable and effective. The internal cavities of elegaz sulfur hexafluoride switch under the high pressure are filled with elegaz sulfur hexafluoride (SF6), by the serving insulating and arc-suppression medium. The construction of elegaz sulfur hexafluoride switches considerably simplifies their maintenance and it makes it possible to carry out
repair work without the preliminary dismantling of equipment.
Moscow energy company has already long ago approached the gradual replacement in its branches of air and oil breakers to the elegaz sulfur hexafluoride, however, the switch with a power of 500 kV is established for the
first time. It is characterized by the low cost of maintenance and has in practice unlimited period of operation under normal conditions. Furthermore, switch is developed taking into account all requirements on the
protection of nature: the insulating and current-conducting components are prepared from the
ecologically clean materials and can be utilized, without disadvantaging to environment.
Nobody will get anything for free ...........
(Posted to Mosenergo website July 29, 2004)
05.07.2004
The interview with Arkady Yevstafyev, AO MOSENERGO CEO
The reform in the power industry in the Moscow region has started. AO MOSENERGO shareholders almost unanimously supported the restructuring plan. Under the plan, 13 new companies should be created. The grid business will be owned by Moscow and Moscow regional governments. For Arkady Yevstafyev, AO MOSENERGO CEO, this means the end of old controversies when he, as a «Chubais man,» was the main irritating factor for Moscow authorities. According to Yevstafyev, he will make his best to implement Chubais-Luzhkov pact that provides for amicable split of AO MOSENERGO assets. However, he does not exclude that the reality may be somewhat different.
Q: Recently, the Prime-minister Mikhail Fradkov has announced that key decisions on the power sector restructuring should be taken only after the steps made after 2001 have been analyzed. He also said that the decision on the mechanism for OGK auctions (privatization of generating companies) will be made no earlier than in December. What is you opinion of this statement? Does it mean that the reforms will be stopped or delayed?
A: The reform imply changes. Naturally, in the course of the reform new factors emerge and the changes in the reform itself are introduced. Moreover, the power industry restructuring is a complex process and not all problems and weak points can be detected right away. We have to track developments and revise many things. There is no threat in what the Prime-minister said. I am convinced that the reform will eventually take place. The government decided to take a break to get a deeper understanding of some issues. I see absolutely no disaster as a result of this statement. Judging by the progress, I see that the government is aware of the need in the electric utilities reforms. The draft proposal for AO MOSENERGO restructuring was approved at all levels and commissions in the government. The reform was also supported by our shareholders. 99,77% of AO MOSENERGO shareholders voted for the reform at the general shareholder meeting. We even did not expect such a positive result. We are pleased that minority shareholders voted for the reform. It was a material event.
Q: How did you achieve that?
A: My first deputy Dmitry Vasiliev visited key European countries and the US. We drafted a special information announcement in accordance with SEC requirements (ADRs are SEC’s jurisdiction). It was crucial to show that all data are true and transparent. This information announcement was filed with SEC.
A: How many shareholders took place in the AGM?
Q: 82.43%. Around 10% of our shares are floated in the form of ADRs that did not take part in the voting. Previously, the Bank of New York sent us voting proxies for those ADR holders who did not give their orders. However, as a result of new voting rules established by the Russian Securities Commission nobody voted for those ADR holders.
Q: You said that in some way the reform will be reassessed. Will the restructuring plan for AO MOSENERGO be changed?
A: The question should not be put this way. There is a principal strategy that will be followed. We implement the plan that was approved by the Russian government. In strict accordance with this plan AO MOSENERGO will be split in 14 companies whose shareholder structure will mirror that of AO MOSENERGO. We have signed agreements on the restructuring of AO MOSENERGO with the governments of Moscow and Moscow region. These are important documents under which the governments have the right to receive controlling stakes in grid companies.
Q: Please, tell, how did you manage to agree on the restructuring with the Moscow Government—your most ardent critic. Is it true that RAO UES CEO Anatoly Chubais agreed to concessions in exchange to support from All Russia Duma faction for Power Industry Restructuring Law?
A: It was a complex process and undoubtedly there was a political rationale. I was not involved in the political process, I only took part in drafting agreements. My opinion is that neither government interest not minority shareholder interests were not damaged.
The procedure for agreeing on all positions was very complex. At first, we obtained approvals from governments of Moscow and Moscow region having passed all government commissions. It was a very big job. After these agreements were approved we got signatures from Moscow mayor Yuri Luzhkov and governor of Moscow region Boris Gromov. These documents laid a framework for further actions. Then we had to approve the restructuring plan adjusted to the agreements which meant passing the whole procedure once again.
Q: Why the governments of Moscow and Moscow region want exactly grid assets?
A: It is quite understandable that heads of any federal entity always want everything. The natural desire of the management is to limit this trend to preserve the balance of interests. Everybody thought that both electric and heating lines is exactly what should be given to municipal authorities. The rationale is as follows: previously, the city built grid facilities that overlap with ours. We operate them all but the costs are not reflected in tariffs. In order to streamline the segment, they wanted to join their and our grid assets by contributing their assets as payment for rights issue for new grid companies. Thus, grid assets will be concentrated in the same hands and the governments of Moscow and Moscow region would set tariffs on grid services.
Q: Is there a preliminary estimate of how much Moscow assets cost?
A: No, there is not. The only thing we have is talking. I view such talking quite negatively. It is irresponsible and non-professional.
Q: Who will carry out the appraisal?
A: Independent appraiser that has international recognition. Everything will be done along usual market lines. By the way, at the BoD meeting at RAO UES German Gref suggested that the stake of the Moscow Government should be increased on market terms, based on independent appraisal, I was pleased to hear this.
Q: Agreements say that after the split of AO MOSENERGO the governments of Moscow and Moscow region may increase their stakes in grid companies to controlling ones. Who or what may force shareholders to vote for the dilution of their own stakes?
A: Such risk always exists and it is usual. Naturally, there can be contradictions, as somebody wants to get assets cheap and the other party does not want to sell them cheap. It is a normal question, and a reasonable solution will be looked for. Nobody will get anything for free. Assets will be exchanged for cash or other assets upon agreement with shareholders which is important and pretty difficult, too.
Q: Is there a risk that agreements will not be observed?
A: This risk is always there, too. There is no complete confidence that everything would go as was planned. For example, in a year the Moscow Government may say: «We have revised our position as the energy market has changed and there are new laws. Yes, we needed it before, but now we’d be better off if we change our position.» Everything may happen.
Q: Moscow is rich. It has assets and money. But how the Moscow region will pay for the rights issue?
A: I would be cautious to state that availability of money means the sufficiency. AO MOSENERGO is not a cheap company. I would like to stress: it a matter of honor for me to complete the agreements that were concluded. On our part, we will execute our obligations in strict accordance with the law and interests of all sides.
Q: Gazprom has been a major shareholder of AO MOSENERGO for several months. At the AGM, two top managers of Gazprombank became BoD members. What is Gazprom strategy towards AO MOSENERGO?
A: So far, Gazprom is assessing the situation. It is true that it has a major stake in AO MOSENERGO. In total. shares of the four companies amount to 15.8%. That’s as of the April ex-date. We had many meetings with them. They are just asking questions about AO MOSENERGO. I understand them. AO MOSENERGO is a pretty complex company. Our chief engineer who has been with AO MOSENERGO for 30 years and has two government awards says that he still does not understand what electricity is. And he is a «family doctor» for the company. So, in order to understand everything, Gazprom would need 30 more years.
Q: Gazprom states that he is interested in gas-fired station, while Moscow needs grids. So, market participants believe that the two companies would just divide AO MOSENERGO. Is this possible?
A: How do you imagine this? So far, none of them has sufficient assets to achieve this.
Q: Is it true that they are coordinating their actions regarding AO MOSENERGO?
A: I know that they meet, have discussions, but nothing else.
Q: When new companies that will be established on the basis of AO MOSENERGO will start operations?
A: As soon as they get registered.
Q: Whose shares out of 14 companies will be used to issue ADRs?
A: It is a difficult question. I don’t want to get ahead of the train, as there is a long process of getting approvals from US SEC. It is up to that body—to permit ADR issuance for a given company. The only thing I can say is that AO MOSENERGO ADR program will remain. It is difficult to forecast other things.
Q: So, ADR holders will lose as a result of AO MOSENERGO restructuring because they won’t get ADRs for new companies. Moreover, their stakes in grid companies will be diluted. Can foreign investors expect any compensation?
A: Is is not correct to state that ADR holders will lose as a result of the reform. All ADR holders will receive shares of new companies that will be created on the basis of AO MOSENERGO. If they don’t want to be shareholders of new companies they will ask the Bank of New York to sell them (the bank is a custodian under the ADR program). In addition, if shareholders do not agree with the reform they can sell their shares in the market or submit to AO MOSENERGO for buy-out.
Q: How do you assess the prospects of new companies that will be created on the basis of new companies? AO MOSENERGO shares are blue chips. But will the shares of new companies be blue chips?
A: Not immediately. The first company that have good chances to become a blue chip is generating company Mosenergo. It will include 17 power stations excluding the four stations (Zagorsk GAES, GRES-24 in Ryazan, GRES-5 and GRES-4) that will be part of other OGKs.
Q: How much time will it take?
A: Hard to say. It is a pretty lengthy procedure. First, the companies have to be registered and only then the listing can be obtained. Each stage is pretty difficult and lengthy. It is not a matter of one month.
Q: Instead of one company there will be 14 new companies. Where are you going to find top-managers? During the transition period (around one year and a half) I will have to be general director in all 14 companies. My deputies in each business area will continue to carry out their work too. Those who will cope well with their duties may become top managers there afterwards.
Q: You will be blamed of holding 14 positions at once and «sucking the blood of people.» Aren’t you afraid of this?
A: No, I am not. I read in a Moscow newspaper that I spend most of the time at the Canaries and have little idea of what is happening in AO MOSENERGO. This is what for people are deprived of their money. Please, believe me, I have never been to the Canaries, it is easy to check. I hope, in the end people will get everything right. How can the electricity sector «suck last blood?» Look at this: every year the gas price goes up on average 14-16%. However, the price for 1Kwt-r may grow next year 8.5-9%. At the same time gas accounts for 92.5% of fuel used by AO MOSENERGO (due to technological and environmental reasons). This is the same gas that becomes more expensive every year 20-24%. Gas payments account in budget for 40-45% of costs. Therefore, one cannot be absolutely sure who drinks what.
Q: Some time ago you announced that AO MOSENERGO is going to independently produce gas. Have these ideas materialized?
A: If you look at the evolution of electric utilities you will see that they buy gas producers, not the opposite. For example, E.ON has purchased Ruhrgaz. We cannot do that but we did not abandon these ideas.
Q: Will they be implemented by Moscow regional generating company?
A: Yes
Q: At what stage is the project now?
A: We have signed the protocol of intentions. The problem is that there are a number of technical problems relating to this field. The owner of the field is Guta Group and they are our partner under this project.
Q: You are purchasing gas not only from Gazprom but from independent producers too. What are these producers and what are the volumes?
A: We purchase 21.8 bcm of gas at regulated prices. We also buy approximately 2 bcm at commercial prices that are considerably higher. But we have a clear criterion-that gas should not be more expensive than the coal because we can substitute gas with coal. If the price is acceptable we purchase gas. If not, we buy more coal. It is very convenient as there is some space for maneuvering.
Q: With what independent producers do you work?
A: Various suppliers offer gas to us. Not everybody can make it. We tell them: sign an agreement with Gazprom on gas transportation and then come to us. Some go and never come back but some succeed. We cannot cooperate with oil companies as they are barred from the pipe. They are ready to give us cheap gas but gas transportation restrictions obviously are not a market measure.
Q: All the time you work for AO MOSENERGO you are harshly criticized by Moscow authorities. Why Moscow mayor Yuri Luzhkov does not like you?
A: This question should be addressed to those who do not like us. But one can note that the heat has lately decreased. We have absolutely businesslike relationships with all Luzhkov deputies. We often meet with them and resolve operational issues. I see that the understanding of our tasks and needs has grown in last six months.
Q: Was it difficult to work for the last several years when complaints went almost to every agency and even to the president?
A: I got used to it. Few people remember that when ORT V channel was disintegrating I was deputy general director for information and everything had to be created anew. It was my time when Vremya program made it back to the air. My life has never been easy.
Q: You became the head of the company although you had nothing to with the electricity sector. Were you not afraid of such adventure?
A: I absolutely disagree that it was adventure. I have several graduate degrees including a technical one. Mathematics teach people to thing and streamline brains. So, if you have desire to study and learn something new, such decisions are natural. It was a well thought-out decision. For one year and a half I worked here as a deputy general director. And becoming head of the team was easy excluding an attempt to prevent me from entering the building and a small punch-up at the entrance.
Q: So, the only thing that darkened your life was the physical assumption of top manager duties?
A: I was not upset at all. Because we have entered in the end. And punch-ups happen very often.
Q: Do they often tell you about the Xerox box?
A: I think they will recall it until the end of my days and tell the story to my children and grandchildren.
Q: Are you sorry about that incident?
A: Not at all.
Biography
Arkady Yevstafyev was born on March 10, 1960 in Saratov. In 1982, he graduated from Saratov State University where he majored in Applied Mathematics. In 1986 he graduated from KGB High School and Diplomatic Academy of the Ministry of Foreign Affairs (1990). In 1990-1992, Arkady Yevstafyev was the second secretary of a department at the Ministry of Foreign Affairs. In 1992-1995, he was a counselor, press-secretary of the deputy prime-minister. In 1995-1997 – deputy general director of the ORT channel. In 1997-2000, Arkady Yevstafyev was deputy general director for government and mass media relations. In 2001-2002 – acting general director, and since 2002 – general director of AO MOSENERGO.
About the company
AO MOSENERGO is the biggest Russian AO-energo with installed capacity of 15,000 MWt (7% of total Russian capacity). The client base is more than 4 mn people. The company’s 2003 revenues were 69.6 bn rubles, the net profit-1,7 bn rubles. As of May 28, AO MOSENERGO shareholders included RAO UES (51%), entities associated with Gazprom (15.8%), ADR holders (11%), Guta Bank (4%), and the Moscow Government (3%).
As of July 2, AO MOSENERGO market capitalization based on RTS trading results was $2,1 bn.
Tatyana Yegorova,
Vedomosti
In the summer of 2004 in the children's health camps will rest about
3,5 thousand. the children of the colleagues OF JOINT STOCK COMPANY of "Mosenergo -
Moscow Regional Administration of Power System Management"
translated - unedited
21.07.2004 g.
Moscow region
JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of
Power System Management" prepares to send to the children's
health-improvement centers also of camp third change of the children
of Moscow power engineers. Entire in summer present year privilege passes into the
health-improvement establishments of energy company obtained almost
3,5 thousand. schoolboys.
Management JOINT STOCK COMPANY of "Mosenergo - Moscow Regional
Administration of Power System Management" pays considerable attention
to the organization of leisure of the children of power engineers. To the colleagues OF JOINT STOCK COMPANY of "Mosenergo - Moscow
Regional Administration of Power System Management" are yearly
allotted privilege passes, on which their children can rest during the summer and winter
vacations. Energy company allows passes into five summer children's camps, located in Moscow region. Furthermore, in this year more than 700 schoolboys will rest on the coast of Black
sea in g. Sochi (camp Of "khosta").
Each summer the workers of camps prepare for the children captivating
creative and health-improvement program. Children walk into the marches, they attend museums, present small masterpieces in the numerous circles are created. Ecological practices and subject festivals regularly are conducted. Special attention is paid to the sport. In the children's camps there are football fields and volleyball
areas, ponds and training halls. Each camp has its distinctive special features. For example, in the territory of the camp of "Mosenergo - Moscow Regional
Administration of Power System Management" in The ruzskeye region of
Moscow region is built the fairytale "city of masters", where the children are occupied in the diverse circles of creation.
"this important company, as "Mosenergo - Moscow Regional Administration of Power System
Management", it cannot but worry about the organization of leisure of the families
of its colleagues. We are glad, that the children of power engineers have the capability to strengthen
their health and it is simply gay to spend time in the camps and the
health resorts ", - notes the division head of the social programs OF JOINT STOCK
COMPANY of "Mosenergo - Moscow Regional Administration of Power System
Management" Yuri Vavilov, - "children, after being once in the health camp, compulsorily they try again here to fall ".
At State Regional Electric Power Plant -5 JOINT STOCK
COMPANY of "Mosenergo - Moscow Regional Administration of Power System
Management" on the special technology is conducted the reconstruction
of the chimney stack
23.07.2004
Moscow
Translated - minor editing
JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of
Power System Management" completes the repair of chimney stack at State Regional Electric Power Plant -5. Reconstruction assumes the introduction of the new technological
solutions and contemporary materials, which will increase the ecological parameters and several times will prolong the period of operation.
The old technology of the surface protection of chimney stacks adapted
Until now in the power system. On this technology the internal surface of the chimney stacks of power stations will be bordered by the layer of special lining brick ("brick
lining"), which protects the ferroconcrete stem of pipe from the action of
products of combustion. The brick lining of chimney stacks is worn out in the course of time, and one time in several years is required conducting the expensive
repair work with the stoppage for a prolonged time of basic power
equipment.
In the course of repair at State Regional Electric Power Plant -5 brick, brick lining will be substituted to the metallic gas-bleeding stem, knots of which are prepared at the Chekhovian plant "hydro-steel" from highly technological types of alloy corrosion-resistant steel of the
type "korten". For the specialists of energy company one must solve complex
technological problem, since the removal of old brick lining and the installation of metallic
coating will pass at the height of 180 m.
Metallic stem possesses a number of the unquestionable advantages. First, it is completely gasproof, i.e., practically it does not pass flue gases to the ferroconcrete
stem. In the second place, metallic stem is more long-lived. Thirdly, in the space between the stems it will be built circular areas and stairs, which make it possible to conduct constant observations of the state of chimney stack. As a result of reconstruction several times will grow the period of the operation of chimney stack.
Installation of metallic stem in the chimney stacks of power stations
- comparatively new technology. For the first time in its power system they used in 1998 on TETs-21. In further JOINT STOCK COMPANY of "Mosenergo - Moscow Regional
Administration of Power System Management" it plans to enlarge the
practice of the application of metallic shielding it is trunk at other
power stations of energy company.
On the gray OF JOINT STOCK COMPANY of "Mosenergo - Moscow Regional
Administration of Power System Management" after conducting of repair
work is released the power unit
translated - unedited
13.07.2004 g.
g. Kashira (Moscow region)
In the beginning of July 2004 on gray by them. G. M. Krzyzanowski after conducting of innovation repair was released power
unit No 4 with a power of 300 MW. In the course of conducting the reconstruction of power unit new
highly technological equipment was established, corresponding to all contemporary requirements of energy production.
The repair work of power engineering gray they approached during April
of the present year. Innovation repair included the reconstruction of fundamental component
of the power unit: boiler, turbine, generator, steam lines and the automatic system for control. In particular, in the course of the reconstruction of the morally and physically
obsolete system of control of power unit was inculcated the modernized
automatic control system of turbine with the use of equipment of firm
"SSS" (USA), which will additionally raise the effectiveness of the control of
current frequency in the power system.
The repaired power unit gray was connected to network before the
appointed time, after the completion of two-day complex tests. In the course of testing the serious disturbances in the work of the
rekonstruirovannogo equipment it was not discovered. Now power unit No 4 will begin work in the regime of the so-called
"controlled operation". In the course of the month the specialists of power station together
with the representatives of the branch of energy company - JOINT STOCK
COMPANY "mosenergonaladka" will control the work of power unit.
Kashira gray is one of the first carbon power stations, elevated according to the plan of the state electrification of Russia
"GOELRO - STATE COMMISSION FOR THE ELECTRIFICATION OF RUSSIA". Today power station produces of about 10% of general electric power in
the system JOINT STOCK COMPANY of "Mosenergo - Moscow Regional
Administration of Power System Management". The installed capacity of six power units gray is 1 580 MW. Kashira power station produces almost 6 billion kVt·ch of electric
power and 430 thousand. Gcal of thermal energy.
In JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of Power System Management" took place the conference on the preparation for the passage of autumn-winter load peak
translation - unedited
08.07.2004
Moscow
On 30 June, 2004, took place conference on the preparation of power system for the passage of autumn-winter load peak, in which participated Director-General Arkady Yevstaf'ev, chief engineer Igor Goryunov, its deputies in the directions and the director of the branches OF
JOINT STOCK COMPANY "Mosenergo - Moscow Regional Administration of Power System Management".
At the conference it was noted, that all repair work at the power stations and in the electrical networks are conducted in accordance with the affirmed graphs. The preparation of capital power system for the autumn-winter season includes in itself also required checking of thermal routes. Hydraulic tests are today carry ouied and the maintenance it is more than 1 468 km of conduit, which composes 66% of thermal networks of energy company. In the course of preparation for the heating season instead of the
worn networks will be substituted more than 70 km of pipes. In this case it is planned to lay 12 km of conduit in the polyurethane-foam (PPU) isolation. The maintenance of the networks OF JOINT STOCK COMPANY "Mosenergo -
Moscow Regional Administration of Power System Management" will be completed toward the end of August.
Furthermore, the deputy chief engineer OF JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of Power System Management" on the thermo-technical part Dmitriy Barshak noted, that "without the deviations goes not only the repair program, but also the program of the reconstruction of equipment ". In particular, in the course of the current repair campaign it is planned to conduct the reconstruction of turbine ¹ 5 on TETs-20, power unit ¹ 4 on gray, boiler ¹ 10 on TETs-22, chimney stack at GRES $$RTGR3S - State Regional Electric Power Plant -5 and a number of other objects.
Conducting the modernization of power facilities will allow energy company not only to support the reliability of power supply at the proper level, but also to increase the quality of field service.
Mosenergo gets 2.1 bln rbl from Mosenergo.
05 July 2004 15:53
Mosenergo has raised 2.1 bln rbl loan with the Bank of Moscow, the bank said.
The funds will go for repair purposes and secure the required fuel reserves to get ready for the heating season.
Mosenergo still holds a majority stake in Moscow MTR-Svyaz alternative operator.
Mosenergo has failed to dispose of 51% stake in Moscow MTR-Svyaz alternative operator, according to the list of Mosenergo-affiliated companies made out as of July 1, 2004.
The decision to sell such stake was taken by the Board of Directors around a year ago.
The stake is to be sold at price which will at least equal the market price, i.e. 10.455 ths rbl. Another holder Tekhnokom (41%) has the right of first refusal.
In the "college of Mosenergo - Moscow Regional Administration of Power
System Management" passed the "day of graduate"
translation - unedited
30.06.2004 g.
g. Moscow
On 30 June, 2004, in NOU the "college of Mosenergo - Moscow Regional
Administration of Power System Management" took place the solemn
ceremony of the presentation of diplomas to graduates of college. In this year the college let out 125 specialists of energy
professions. With the difference they finished the instruction of 19 graduates of
the "college of Mosenergo - Moscow Regional Administration of Power
System Management".
According to tradition holiday program began from the meeting in the
walls of the Moscow Kremlin in with Aleksandrovsk to garden. Then children laid flowers to the grave of unknown warrior. The solemn ceremony of the presentation of diplomas took place in the
walls of college. The diplomas of technician- power engineers entrusted to graduates, bookkeeper- economists and managers.
In three years of instruction the students of college obtained not
only unique theoretical knowledge, but also practical preparation. The majority of young specialists will be accepted to the work into
the branches of Moscow energy company. The substantial part of the graduates plans to continue their
formation in such higher educational institutions, as the Moscow Power Engineering Institute (MEI) and Moscow Institute
of Steel and Alloys (MISIS).
the "college of Mosenergo - Moscow Regional Administration of Power
System Management" it has available contemporary scientific and
technical base and injects foremost teaching procedures. In the college the highly skilled instructors work, which regularly participate in the all-Russian and international
conferences on questions of the development of vocational education.
Coming out before the graduates, the director OF NOU the "college of Mosenergo - Moscow Regional
Administration of Power System Management" the deserved teacher RF
Vladimir Temnik noted, that the interest in the profession power engineering among the young
people grows yearly. "at the present moment in the college are passed entrance
examinations. In this year we can grant 175 places for those only, who wants to be trained to energy and economic specialties, and such desiring it is more than 400", - emphasized Vladimir temnik.
New Mosenergo Board
MOSCOW (Reuters) -- Two officials from Gazprombank, owned by gas monopoly Gazprom, have gained seats on the board of Moscow city electricity utility Mosenergo, Mosenergo said Tuesday.
The appointments confirm newspaper reports and market rumors that Gazprom had been acquiring shares in Mosenergo prior to reform of the electricity sector.
Mosenergo said in its disclosure materials that Gazprombank deputy chairmen Alexei Matveyev and Alexander Sobol would sit on its board.
Market participants said Gazprombank spent 10.9 billion rubles ($375.6 million) to buy 15.76 percent of Mosenergo last May, and 19.8 billion rubles to buy 5.3 percent in national electricity utility UES.
Mosenergo BOD chaired by Yu. Udaltsov.
29 June 2004 16:35
Mosenergo Board of Directors elected Yury Udaltsov, RAO UES board member, to chair the BOD, Mosenergo head Arkady Evstafiev told the press conference.
---------------------------------------------------
2 top managers of Gazprom, 4 managers of RAO UES and UES affiliated companies, 2 Moscow officials, 3 managers of Mosenergo, heads of Guta, NIKoil-Sberezheniya were elected to the 13-seat Board of Directors of Mosenergo at June 28 AGM.
Mosenergo has 28,267,726,000 rbl in stock capital.
RAO UES holds 50.87%. Gazprombank has around 15.76%, Guta-Bank - 4%, Moscow government- 8%.
In the Pension fund JOINT STOCK COMPANY of "Mosenergo - Moscow
Regional Administration of Power System Management" will be enumerated
3 million rubles
translated - unedited
29.06.2004 g.
g. Moscow
On 31 May, 2004, the council of the directors OF JOINT STOCK COMPANY
"Mosenergo - Moscow Regional Administration of Power System
Management" approved the solution of the administration of company
about the enumeration of the additional contribution of founder in the
size of 3 million rubles into the non-governmental Pension fund (NPF)
by "Mosenergo - Moscow Regional Administration of Power System
Management". The joint contribution of the founder of the Pension fund JOINT STOCK
COMPANY of "Mosenergo - Moscow Regional Administration of Power System
Management" was increased for purposes of the participation of energy
company in the conducted in the Russian Federation pension reform
through NPF of "Mosenergo - Moscow Regional Administration of Power
System Management".
For the participation NPF of "Mosenergo - Moscow Regional
Administration of Power System Management" in the pension reform in
accordance with the federal law OF RF "about the non-governmental
Pension funds" the size of the joint contribution of founders must in
2004 comprise not less than 3 million rubles, and since 2005 - not less than 30 million rubles. Therefore for purposes of the retention OF NPF and its further
development energy company plans to transfer to 2005 the additional
contribution in the size of 30 million rubles.
NPF of "Mosenergo - Moscow Regional Administration of Power System
Management" is corporate non-governmental Pension fund - the
noncommercial organization of social welfare. It is founded by the solution OF JOINT STOCK COMPANY of "Mosenergo -
Moscow Regional Administration of Power System Management" on 20
October, 1993, in accordance with the President's Decree of the
Russian Federation "about the non-governmental Pension funds". The basic purposes of creation NPF of "Mosenergo - Moscow Regional
Administration of Power System Management" is an increase in the
social protection of pensioners - the former workers of Moscow energy
company, in the form of the payments by them of non-governmental pension. Another most important planned direction of the activity OF NPF
"Mosenergo - Moscow Regional Administration of Power System
Management" - participation in the pension reform - the accumulation
of the means of pension accumulations, the organization of their investment for the purpose of obtaining the
investment income, designation and the payment to the storage part of the working and
professional pensions to the insured persons. Today fund attends almost 9 thousand. the inoperative pensioners, which monthly obtain additional payment to the state pensions.
At the present moment specialists NPF developed the new rules of the
Pension fund, and there will soon be podana claim into the authorized federal organ
of executive power to obtaining of new license on the realization of
activity in the non-governmental pension guarantee and the required
pension insurance.
After the restructuring JOINT STOCK COMPANY of "Mosenergo - Moscow
Regional Administration of Power System Management" each isolated
enterprise will independently conclude with NPF of "Mosenergo - Moscow
Regional Administration of Power System Management" the agreement
"about the non-governmental pension of its workers" and independently
establish the level of the non-governmental pension of its pensioners.
Mosenergo expects few shares to be redeemed
RosBusinessConsulting. Tuesday, Jun. 29, 2004, 6:08 PM Moscow Time
The management of Mosenergo believes that the number of shareholders wishing to offer their shares for redemption will be insignificant. Mosenergo Senior Deputy General Director Dmitry Vasilyev declared at a news conference in Moscow today that a vast majority of the shareholders in the company had voted for the drafted program of reforms in the company at the annual general meeting. According to him, this shows serious confidence in the management, and therefore, the number of shareholders wishing to sell their shares will not be high. However, the company has reserved finds for buying out shares. If the amount of shares to be bought out is low, the funds that have been reserved will be allocated for the company's internal needs, Vasilyev pointed out. Additionally, these funds may later be necessary for founding new joint-stock companies to be separated from Mosenergo. Vasilyev underlined that a decision to submit shares to the management for redemption would hardly be efficient, as the present market price of the company's shares is higher than the price estimated by an independent appraiser. The deputy general director of Mosenergo added that complete understanding with all creditors had been reached, and none of them would require that the company fulfill its liabilities ahead of schedule with regard to the reforms. Liabilities to foreign creditors will be reassigned to the power generating company, which will keep the Mosenergo name, Vasilyev remarked. As reported earlier, Mosenergo's shareholders approved a drafted program of reforms in the company on June 28. Under Russian law, shareholders who did not participate in the voting on this issue or voted against this decision are entitled to submit their shares for redemption.
Ministry proposes to merge hydro gencos
Interfax. Tuesday, Jun. 29, 2004, 6:10 PM Moscow Time
MOSCOW. June 29 (Interfax) - The Russian Economic Development and Trade Ministry has already sent a proposal to the Industry and Energy Ministry to merge four wholesale generating companies (gencos), to be set up based on hydroelectric plants, into a single company, First Deputy Economic Development and Trade Minister Andrei Sharonov told Interfax.
He said that to merge the hydro gencos the Economic Development and Trade Ministry plans to make amendments to a government resolution that confirms the setting up of 10 gencos. "Now, instead of hydro gencos No. 7, No. 8, No, 9 and No. 10 there should be one," the deputy minister said.
Sharonov said that the Economic Development and Trade Ministry does not plan to prepare a separate directive for state representatives on the board of directors of Unified Energy System of Russia about the unification of the hydro gencos. "It may be signed only to reach a decision on the setting up of this concrete company," he said.
Deputy Prime Minister Alexander Zhukov on June 2 directed the Industry and Energy Ministry and the Economic Development and Trade Ministry to submit a draft decision on this issue within two weeks. However, it has not yet been submitted.
A government resolution confirming the configuration of the future gencos was passed in 2003. According to this document, it was planned to include Volga-Kama Cascade Hydroelectric Plant and Caucasian hydroelectric plants into the sixth and seventh gencos, Siberian and Far East hydro plants into the eight; the ninth was to be set up based on one plant - Zagorsk Hydro-Accumulator Station, which is currently part of OAO Mosenergo.
The concept for the reform of the electricity sector states that the government will not reduce its stake in hydro generation or, as a result, in the hydro gencos being set up
Mosenergo 2003 dividend up 18.5% on year - 0.02169 rbl/common stock and 613.1 mln rbl overall.
29 June 2004 12:41
Mosenergo will pay 2003 dividend of 0.02169 rbl/common stock. Stock par is 1 rbl.
The respective decision was taken by the holders at the annual meeting on June 28.
613,126.976 ths rbl will go for dividend purpose overall, 18.5% up on year.
59.6% of the net profit will go to the accumulation fund, 5% - to reserve fund, 35.4% - for dividend purpose.
2003 net profit increased 2.7 fold to 1,730.98 mln rbl under RAS from 646.25 mln rbl a year earlier. IAS net profit stood at 737 mln rbl vs. the net loss of 2,341 mln rbl.
Mosenergo has 28,267,726,000 rbl in stock capital. 28,267,726,000 common stocks, 1 rbl par each, were released. Renaissance Capital holds around 12%, Guta Bank - 4%, Moscow government - 8%.
RAO UES holds 50.87%.
[AKM]
RSM-Top-Audit to audit Mosenergo for another year.
29 June 2004 12:49
RSM-Top-Audit Auditing & Consulting Group will audit Mosenergo report both under RAS and IAS accounting standards in 2004.
The auditor was approved by the holders at June 28 AGM.
RSM-Top-Audit has been auditing Mosenergo reports since 2001.
[AKM]
Mosenergo holders seal the company`s reorganization.
Mosenergo holders approved of the company's reorganization at June 28 AGM.
29 June 2004 13:05
As planned, Mosenergo will reorganize by splitting off the Management Energy Co., Backbone Grid Co., Moscow City's Power Grid Co., Moscow Heating System Co., Moscow Region's Power Grid Co., Mosenergosbyt, Special Design & Construction Bureau for Repair & Rebuilding. Mosteplosetenergoremont, Mosenergosetstroy, GRES-4, GRES-5, GRES-24, Zagorskaya GAES.
The stocks will be distributed among the holders.
Mosenergo holders voted against reorganization or refused to vote, may sell their stocks over 45 days after the voting, i.e. before Aug. 12, 2004. ADR holders have the similar right. Mosenergo may allocate max. 10% of the net assets (as of June 28, 2004) to buy out the stocks.
The delegation of Italian legislators visited TETs-27 JOINT STOCK
COMPANY of "Mosenergo - Moscow Regional Administration of Power System
Management"
translated - unedited
28.06.2004
Moscow
On 22 June within the framework of weekly visit to Russia the
delegation of the senate of Italian republic visited one of the
ecologically clean power stations themselves to Europe - TETs-27 JOINT
STOCK COMPANY of "Mosenergo - Moscow Regional Administration of Power
System Management". Within the framework of encounter Italian parliamentarians and Moscow
of power engineering conducted "round table" on questions of the
development of ecological safety system in JOINT STOCK COMPANY of
"Mosenergo - Moscow Regional Administration of Power System
Management".
Italian delegation arrived at the invitation of Russian associates
from the Federation Council RF. Heads delegation the chairman of the commission of the senate of
Italian republic on the protection of environment Emiddio of virgin
soil. On 21 June took place official encounter Emiddio of virgin soil and
first Deputy Chairman of the committee of Federation Council for
natural resources and protection of surrounding media Nikolai
Churkina. Purpose of the visit of Italian parliamentarians - exchange of
experience and of opinions on a number of crying problems in the
sphere of the protection of environment. In particular, it is planned to estimate ecological situation and prospects for the
connection of Russia to The kiotskomu protocol.
JOINT STOCK COMPANY of "Mosenergo - Moscow Regional Administration of
Power System Management" is the most important regional energy company
of Russia and forms the largest and significant production in Moscow. The nature-conservation activity of energy company in many respects
determines the ecological situation in the region, therefore the members of Italian delegation expressed the desire to
visit within the framework of their visit of enterprise, entering the structure JOINT STOCK COMPANY of "Mosenergo - Moscow
Regional Administration of Power System Management".
The conducted in the energy company nature-conservation measures to
Italian parliamentarians demonstrated based on example TETs-27 JOINT
STOCK COMPANY of "Mosenergo - Moscow Regional Administration of Power
System Management". During the trip on TETs-27 delegation they accompanied the first
adviser on economic questions of the embassy of Pierre- Francesco
Dzadzo's Italy in Russia, the director of power station Igor Dolinin, and also the representatives of the general board JOINT STOCK COMPANY
of "Mosenergo - Moscow Regional Administration of Power System
Management": the division head of foreign economic ties and protocol Dmitriy
Trofimov, the chief of a service of ecology to Peter Bubley.
In the completion of encounter Emiddio of virgin soil noted the high
level of the organization of nature-conservation activity in the
enterprises OF JOINT STOCK COMPANY "Mosenergo - Moscow Regional
Administration of Power System Management". In particular, he stated, that visit TETs-27 JOINT STOCK COMPANY of "Mosenergo - Moscow Regional
Administration of Power System Management", It goes without saying, it became for the delegation of the commission of the senate of
Italian republic on the protection of environment to "one of the
brightest and memory events in the program of a stay in Russia".
"the concern about the ecology of region is one of the priority
directions of the work" of Mosenergo - Moscow Regional Administration
of Power System Management ", - he noted Peter Bubley. - for these purposes energy company conducts the modernization of
equipment and injects in the production new technologies. As a result in comparison with the data 1993 the ejections of the
basic pollutants from TES JOINT STOCK COMPANY of "Mosenergo - Moscow
Regional Administration of Power System Management" were reduced
almost two. By nonaccidentally its motto company selected words "to the light, to heat and to pure air ".
In preparation for the heating season, AO MOSENERGO tested and repaired more than 40% of water lines
16.06.2004
In 2004, the Heating Grids of AO MOSENERGO have started the maintenance campaign on May 11. Currently, all operations are conducted in the strict compliance with the schedule.
Under the annual guidelines on prepation for the heating season, AO MOSENERGO carries out mandatory testing of heating lines that results in 21-day water supply switch-off in Moscow. The length of this period was approved by the Moscow Government. AO MOSENERGO has to cut water supply to test parts of the water supply system. AO MOSENERGO has never extended maintenance perod and on many occasions completed the work earlier than was planned. In October, the Company's divisions receive readiness certificates that confirm their preparedness for winer operation.
As of today, AO MOSENERGO has repaired more than 913 km of main heating lines which equals 41% of the total maintenance volume. From the start of the maintenance campaign AO MOSENERGO detected and eliminated 1,830 pipe defects. AO MOSENERGO plans to complete the maintenance by end-August.
In preparation for the winter peak load AO MOSENERGO will lay 70 km of new pipes. In addition, in 2004, the company will lay 12 km of pipes insulated with polyurethane foam that are more reliable and have longer operation lives. As a result, the total length of new insulated pipes will grow 16%.
In accordance with the plan, AO MOSENERGO carries out maintenance on pump stations. In the second half of August, the Company will carry out overall testing and then will put them into operation. In addition, in IIIQ04 AO MOSENERGO will complete Businovo pump station which will help to improve the heating services in the Northern District.
Followers
|
1
|
Posters
|
|
Posts (Today)
|
0
|
Posts (Total)
|
39
|
Created
|
06/27/04
|
Type
|
Free
|
Moderators |
Volume | |
Day Range: | |
Bid Price | |
Ask Price | |
Last Trade Time: |