Satori Extends Main Zone 200 Metres, Intersecting 6.9 g/t Au over 5.0 Metres V.BUD | August 11, 2021 Toronto, Ontario--(Newsfile Corp. - August 11, 2021) -
Satori Resources Inc. (TSXV: BUD) ("Satori" or the "Company") is pleased to report final results from the Phase One drill program at its 100%-owned Tartan Lake Project, Flin Flon, Manitoba.
TLMZ21-04 intersected 6.90 g/t Au over 5.0 metres; TLMZ21-02 intersected 5.88 g/t over 3.4 metres; Overall, five of six holes planned were completed, four of which intersected typical quartz-carbonate-tourmaline veining typical of the Main Zone mineralization; These latest results expand upon and confirm the results of hole TLMZ21-01 (9.73 g/t Au over 4.15 metres), indicating that the Main Zone remains open at depth offering immediate potential to increase the mineral resources through further drilling; and The Company advises that the Phase 2 program at Tartan Lake has commenced. Jennifer Boyle, Chief Executive Officer commented, "The Phase 1 results clearly demonstrate that the Main Zone continues to depth and offers an immediate opportunity to increase the mineral resources at Tartan Lake with additional drilling. Our fully-funded Phase 2 drill program is currently underway and our initial target will be the South Zone where we plan to test additional interpreted structural trends near surface where there are gaps in the current drill pattern. Additional holes targeting the Main Zone are planned but drilling the near-surface mineralization at the South Zone is our initial Phase 2 target. We also plan to commence reconnaissance field work on select geophysical targets outside the mine area once the forest fire situation is under control in northern Manitoba."
$Satori Drills Longest and Highest Grade Interval at South Zone Averaging 9.59 g/t Au over 11.75 Metres Interval within a mineralized envelope grading 4.76 g/t over 27.8m Toronto, Ontario--(Newsfile Corp. - October 7, 2021) -
Satori Resources Inc. (TSXV: BUD) ("Satori" or the "Company") is pleased to report results from the first hole (TLSZ21-05) drilled in the Company's Phase II drilling campaign, targeting a separate location, the South Zone, at Satori's 100% owned Tartan Lake Project, Flin Flon, Manitoba.
The results suggest continuous gold mineralization within the deposit area, and hole TLSZ21-05 is the longest high-grade intercept returned to date from the South Zone. This hole is the fifth diamond drill hole of Satori's 2021 drilling campaign, and is proximal to the underground ramp/decline. Previous holes reported targeted the Main Zone mineralization, 200 metres to the northwest (Ref. Figure 2).
TLSZ21-05 is the longest and highest grade interval ever reported from the South Zone deposit; Quartz-carbonate-tourmaline veining assayed 9.59 g/t Au over 11.75 metres; Mineralized Intersection included 24.23 g/t Au over 2.00 metres and 13.05 g/t Au over 3.29 metres; and Mineralization remains open at depth along plunge. TLSZ21-05 was the first hole drilled at the South Zone during Satori's 3000 metre Phase II 2021 drilling campaign. Drilling targeted the interpreted steep westerly plunge to the high grade mineralization (Ref. Figure 1).