As Dittman sits on the Board of Directors of Greenway Wellness, it would have been relatively easy to put a letter of intent in place, with signed contracts to follow as zoning approvals occur and facilities are readied to receive the pods - this part of the work at each site may be substantial. Commercial buildings are designed to unload a container at a loading door, not move the entire container inside a building!