I would guess that if their goal is to mine 250,000 mt of barite (which I highly doubt they'll achieve), they will have to move 3-5 million mt of overburden and waste rock. Hell of a hole for a vein that is steeply dipping. It'll never happen, they'll go broke first.
[1]There approx 250,000 mt of overburden to be removed before they start mining ! and then there's the tunnels they need to be careful or they could get a collapse and loose equipment
[3]Mabwe will soon realize that they should have done those Core drilling and feasibility study and approached this another way mining at a profit is all about doing things the correct way not going in guns blazing ! but analyzing and strategy
PLEASE EXPLAIN 250,000 MT OF OVERBURDEN?
THIS PHRASE IS NOT A MINING TERM .
[2]By now Mabwe are starting to realize that things are not going there way !
ARE MABWE STARTING TO REALIZE THINGS ARE NOT GOING THERE WAY?
The rainy season is coming and we are expecting heavy rains Groves has not been honest with them !
IS THERE WEATHER INFORMATION THAT CAN BE SITED TO SUPPORT THIS ARUGMENT?