News Focus
News Focus
icon url

DITRstocks

01/24/13 8:47 AM

#15516 RE: Pastor Phil #15514

$USGT Development Plan
This large graphite project will require a work program to include additional mapping, sampling and trenching over the entire extent of the graphitic hornfels units. This will be followed up with an electro-magnetic (EM) geophysical survey and an extensive drill program to delineate the potential size of the deposit. Phase Two program would include a prefeasibility scoping study based on the results of the first phase work program.