With the closing of the injection wells in Fayetteville shale, the non-recycling fracturers are now hauling flowback to Oklahoma 4 1/2 hrs. each trip. The drought has kicked in full force with limited access to water. Ecosphere has the solution, and are closing in on the manufacturing goals. IMHO