I agree. I feel the addition of the tubes is the only way they will truly get there. I was recently on a job site where Geo tubes were being used to clear an abandoned sediment pond. I was somewhat surprised that once filled it took some time for the water to filter through. There were 3 tubes lined up on a sheet metal trough and were alternated being filled. Not knowing how much water the mill process is using I think they may be reaching a limit with the exist tubes. They may need to let them settle before continuing production.
It has been some time since they PR'd the new tubes were ordered. They should have been delivered and installation should have begun.
I am not bashing. I just don't want any unrealistic expectation to start and have a massive dump as did happen in August. I am a long and as of today my first lot of purchased share hit the one year mark.