My point was, there are many mom & pop miners with similar equipment, in Alaska, that process 1000 tons of material a day. I f they get 1/10 oz per ton, and work 6 months, that's almost 20,000 oz. The old guy with the claim next door was probably doing a lot more than that.( Yes, I'm aware that a heap leach operation is totally different from a washplant). Regardless, this company seems to really think big when it comes to hiring engineers ,geologist, drilling, aquiring property,financing, increasing reserves, uplisting; and then they come up with this wimpy production number. It doesn't seem to fit. IMO, they should be talking about scaling that up to 40,000 - 60,000 oz in 1-3 years, but they haven't. Let's think big.