OilStockReport

10/27/10 1:06 PM

#18972 RE: vikco #18971



Typically in my experience bringing in qualified parties can often bring the connections to pull this kind of stuff off. Getting into their 12 month plan of operations today.





Our twelve-month plan of operation:

We are an exploration stage oil and gas exploration company, devoting substantial effort to raising capital to support our exploration and development of sub-surface hydrocarbons in commercial quantities in Tasmania, Australia. Our primary focus is the discovery and exploitation of oil and gas and we intend to apply all resources to that purpose. We currently have four wholly-owned subsidiaries: Great South Land Minerals Limited, Bob Owen Company, Cyber Finance Limited and Expedia Limited. Our primary endeavor is the exploration for and development of oil and natural gas in the state of Tasmania, Australia undertaken by GSLM and our resources are being focused on that activity

Great South Land Minerals Limited’s principal asset was its exploration license in Tasmania, 15,035 km 2 (37.2 million acres) Special Exploration License 13/98. The terms of the Great South Land Minerals Limited Special Exploration License 13/98 were contractually agreed with Mineral Resources Tasmania, the local authority under the Department of Industry, Energy and Resources of Tasmania. The Company had expenditure obligations under the license conditions. The conditions required scheduled reported expenditure of AUD $21.5 million (US $16.69 million), by September 2009. The company reported accumulated expenditure to date of AUD $50.8 million (US $43.7 million). Expenditure is reported under the regulations of Mineral Resources Tasmania by Great South Land Minerals Limited. The exploration and development expenditures disclosed in the Consolidated Financials and Notes were prepared using USA Generally Accepted Accounting Principles which is different to the definition of exploration expenditure of Special Exploration License 13/98, but approximate the USD $46 million deficit accumulated during exploration stage.

Special Exploration License 13/98 expired September 30, 2009. In September 2009, Great South Land Minerals, Ltd lodged an application for an Exploration License covering the significant identified prospective areas included in the SEL 13/98 effort. The application was granted for a reduced area of approximately 3,000 square kilometers on May 17, 2010 as Exploration License 14/2009, determined to include the two most prospective areas identified by the work performed under SEL 13/98. The Company believes Special Exploration License 13/98 provides a right to the award of the exploration license over selected areas covered by that license and continues to work for and plan for the inclusion of the full area covered by SEL 13/98 in the area covered by Exploration License 14/2009. Award of the Special Exploration License is at the discretion of the Minister but the Company believes its performance over past years support the issuance of the new license. Should the additional area in the current applications not be granted, we intend to reapply and to seek rights to additional exploration property that we have not yet identified. The following seismic and evaluation work includes the area licensed under EL 14/2009.

Terrex Seismic performed on our behalf a AUD $4.4 million (US $3.0 million) 2007 seismic survey which was additional to the approximately AUD $2.23 million (US $1.54 million) 2006 program and the 660 line kilometers of survey that we acquired from 2001. A total of 1149 line kilometers have been acquired. These surveys have indicated the presence of over 14 structures which have the potential to have trapped oil and gas. Our two largest structures the Bellevue Dome (anticline) and the Thunderbolt Dome (anticline) are structures over 1000 sq km (2.47 million acres) in area and have the potential to contain substantial volumes of oil and gas.

The seismic program commenced on a 58.76 kilometer survey area in Tasmania around the township of Zeehan in March 2007, finished that survey and commenced the program on property covered under Special Exploration License 13/98 (predecessor to Exploration License 14/2009 granted May 17, 2010) in April 2007. The information obtained from this activity on an outside area assisted with the interpretation of the seismic signature of deeper rock sequences under the Tasmania Basin which we have classified as being within the Larapintine petroleum system. It is one of three petroleum systems currently identified as prospective onshore Tasmania and the Gondwana Land System which outcrops at the surface (commonly known as the Tasmania Basin) is analogous to the Cooper Basin (in central Australia) which was discovered in the early 1960’s.

With our consultants, we reviewed the geology and geophysics of the Central Highlands of Tasmania, using data acquired from the 2001, 2006 and 2007 seismic surveys and previous extensive regional ground gravity and aerial magnetic surveys acquired during the last 20 years. This work assisted in further defining drilling targets and will form the basis of well location, design and engineering. He also coordinated a more detailed prospect definition gravity survey to assist with the interpretation and analysis of the seismic results. The gravity data was acquired by independent contractor Solo Geophysics.

In the fourth quarter 2007, we performed additional seismic surveys in certain areas identified by the prior 2D survey as the apex of potential targets that have potential oil and gas traps and then engaged in 3D surveys to supplement and expand earlier data with the view of assisting in the management of an extraction plan should our exploration wells be successful in discovering reserves which can be produced.

In 2008 international geoscience consulting company RPS Energy prepared an updated Competent Person’s Report on GSLM’s tenement and Beacon Equity prepared a research report on Empire Energy that covered GSLM’s activities. During early 2008, final site selection was carried out for drilling exploratory wells using previously acquired geological, geophysical and geochemical data. Extensive environmental, forestry, heritage, archaeological, acoustic, hydrogeological and engineering studies were carried out on the Bellevue and Thunderbolt structures and sites at Bellevue and Thunderbolt were selected. A management system audit of Hunt Energy and GSLM was carried out in August 2008, drilling plans for Bellevue#1 and Thunderbolt#1 were submitted to Mineral Resources Tasmania and approval to drill both exploratory wells was obtained. Preliminary investigations were also carried out at the Lonnavale #1 well site. Extensive site work began at Bellevue#1 in the July and August 2008.

In July 2008, with the financial guarantee of our Chief Executive Officer, we obtained a secured loan from Smart Win Limited in the amount of AUD$5 million (US$3.47 million) to pursue the drilling program in the property area covered by SEL 13/98. Initial draw on this loan of approximately AUD$2.7 million (US$1.86 million) allowed mobilization of the drilling contractor, prepaid initial drilling cost and provided working capital to the Company. Additional drawing under this note was expected to fund the drilling program and complete at least the first well. In conjunction with this note, we agreed to a memorandum of understanding that could bring up to AUD$45 million (US$31.1 million) to the drilling program in exchange for up to a 50% interest in the license property. This additional funding was intended to allow drilling of up to an additional 14 exploratory wells in 2009. In October 2008, the drilling program was stopped when SmartWin failed to advance the remaining AUD$1.1 million (USD $759,770) due under the AUD$5 million (USD $3.45 million) Note and in September 2009 Smart Win notified us that they would not pursue the joint venture and the note should be repaid as Smart Win considered the Note to be in default.

During August and September 2008 we commenced drilling on the Bellevue # 1 site and completed the pre collar hole to 272 meters. The initial rig was removed to make way for the deep drilling Hunt Energy rig to move on site to finish the well. Onsite inspection was conducted by MODUSPEC whose report on the condition of the rig was received on the 30 th December 2008. The funding shortfall includes the failure of SmartWin to advance the remaining AUD$1.1 million (USD $759,770) due under the AUD$5 million (USD $3.45 million) Note as well as the effects of the global financial crisis and the apparent refusal of creditors to advance funds on new projects and the failure of historic sources of those funding exploration ventures. Due to this funding uncertainty and the length of time on hold, the suspended exploration and drilling costs incurred of $8,271,190, (including $3,829,474 incurred in 2009) on the well were charged to expense in 2009. Management remains confident that this shortage of operating capital will ease but there can be no guaranty that we will be able to finance the balance of our project at this juncture, which could cause the failure of our business. We have incurred significant standby charges. At June 30, 2010 we have accrued a balance of $1,682,000 in charges owed to Hunt Energy.

In April 2009, we filed applications for two additional tenement licenses in Tasmania. One application for the coal-bed methane horizons of the existing SEL 13/98 tenement which would be tested commencing with the Bellevue #1 exploratory well. The second application for a further 12,040 sq kilometers of tenement on the Eastern seaboard of Tasmania, which includes approximately 5,000 sq kilometers of offshore area, where 7 kilometers of onshore and 256 kilometers seismic operations were previously carried out. Mineral Resources Tasmania declined to grant these applications. We have lodged additional applications in conjunction with the September 2009 expiration of Special Exploration License 13/98. One of the additional applications was granted May 17, 2010, the other remains under consideration.

We have analyzed the data collected over the past thirty years, have selected prospective sites, arranged a drilling contractor, arranged interim funding and are aggressively pursuing additional funding to drill wells on these sites as well as continue to expand the seismic and other technical knowledge on this license area.


icon url

BobSinCA

10/27/10 2:46 PM

#18981 RE: vikco #18971

Anyone know what the 'conditions precedent' are, related to the Sure funding, for which the $20M LOC is required?

My speculation is that the funds will pay for the items discussed in the September 3 PR

Included in this statement of charges are the fees associated with the preparation and issuance of a prospectus for principally protected notes, the purchase of an insurance policy to enhance the rating and quality of these notes, the fees incurred to have the notes rated by an internationally accredited rating agency, the costs related to the placement of the notes with investors as well as management fees for the above Bermuda-based management services.

However, back in Sept others thought that these costs would be paid out of financing proceeds, not by 'up front' costs out of EEGC's (empty) pockets. So, that begs the question of what 'conditions precedent' have to be funded -- or is the LOC itself the condition precedent??

And yes, we all hope it will not take as long to arrive as Mr. Bendall's has taken.