Any company that produces anything. I am not talking about a P2O production permit. The product does not really matter. Anybody that builds a plant that may impact the environment needs one of these permits. All the PM has to do is find out the timeline and get his/ her paperwork in on time...
I find it a bit weird that JB himself put this on a slide and now has everbody waiting with baited breath for this permit. It should not be a big deal. Of far more importance is that he has his process figured out, so that he does not have more instrumentation than he needs, that he has his safety and operational stuff figured out, and that he has the whole thing packaged with up-to-date drawings that can be assembled by a general Electrical/ Mechanical Contractor anywhere in the United States... before he runs out of money.