I think the PR said it was the 150 model. I'm not sure if it said anything about the tonnage capability as far as processing goes. I'm going to go re read the PR.
"The company intends to commence operations as soon as possible. To this end, management has also signed a purchase agreement for the first of its water gravity recovery equipment -- Aero Mining Technologies' new Dove Superminer 150 plant that operates 15 tons of raw earth per hour -- which may be delivered to the property in as few as 30 days."
Placer pronounced (plasser) mining. If they can dig down several dozen feet without hitting Bedrock, they could have it easy extracting this gold. Placer is surface mining. I found a geological map of this area from the USGS. Talked about some water issues and polition. Leach mining has a by product called gypsum. Yep like the walls. I wonder how much that goes for. But it doesn't look like they are going that route.