News Focus
News Focus
icon url

juxtaposezen

06/09/08 11:59 AM

#67939 RE: Sulphur Mt. #67936

Thats a thought. I was thinking that often times on a big construction job they bring in a modular office to house the General Contractor/Foremans etc. before the foundation is even poured?
icon url

spec machine

06/09/08 12:07 PM

#67944 RE: Sulphur Mt. #67936

It may be a combined office complex for DDI, Electrowave, admin functions, sales, ordering, billing, accounting, engineering/design.

Remember that one of their stated objectives is a "manufactured systems" division, which they already have in a way. I think the "manufacturing" as opposed to "custom fabrication" may be in the cards sooner than some think.

I have some ideas of what direction their next acquisition may take in bridging a gap (a perceived gap in my mind). I'll ponder it a while and see if there are any other indications in that direction.