4Mars - I noticed that (btw, out of posts so squeezing this in here). Front page news. Look under Company operations and you'll see the Delba news which was also front page for most of today.
Thanks Joe. I was thinking, "DDI did some work for Perdido but it is all ROV installable and perhaps the spar doesn't have any of DDI's work in it yet" - and boom, you produce the evidence that it indeed does have them "pre installed" (over in Pori, Finland?). You know, there could be probably an additional $1M worth of work if they need those 9 additional BS Latchers receivers (for the I-tubes without them right now) at some point in the future. BTW, I believe those "cylindrical drifts" or "mini AUVs" as some of us were having fun speculating, are part of this as well. Total $1.5M worth of prime hardware.